CHAPTER 4: SPECIAL CONDITIONS OF CONTRACT<br />

4.1 GENERAL<br />

(i)<br />

These Special Conditions of Contract (SCC), "Schedule of Material &<br />

Works" and Technical Requirement & Specification and provision of tender<br />

document shall govern the works to be executed under this contract in<br />

addition to and/or in part super cession of the General Conditions of<br />

Contract (GCC) with latest amendment / Correction Slips and Standard<br />

Specifications as laid down in the <strong>Western</strong> <strong>Railway</strong> Works Hand Book, Part<br />

III as amended up to latest correction slips.<br />

(ii) Where there is any conflict between these Special Conditions of Contract on<br />

one hand and Standard Specifications and General Conditions of Contract<br />

of <strong>Western</strong> <strong>Railway</strong> on the other hand, the former (SCC) shall prevail.<br />

(iii) Any deviations from these Special Conditions of Contract, Technical<br />

Requirement & Specifications, Schedule of Material & Supplies and/or any<br />

condition of tender document, if any, stated by the tenderer in his tender or<br />

subsequently introduced by the <strong>Railway</strong> shall be a part of the Contract only<br />

to such extent as have been explicitly accepted by the <strong>Railway</strong> and<br />

incorporated in the contract.<br />

(iv) These specifications/documents describe the material to be supplied, work<br />

to be performed and the method of construction for the complete installation<br />

in strict accordance with the drawings and specifications mentioned herein<br />

and such instructions as may from time to time be given by the <strong>Railway</strong>. The<br />

contractor shall quote for work giving all information after close scrutiny of<br />

the plans and site survey.<br />

(v) Unless specifically provided otherwise in the tender, any and all exception,<br />

which the tenderer may have to any of the clauses of the special conditions<br />

of contract or, technical requirement & specification as included in the tender<br />

shall be clearly stated. Such exceptions shall be listed in “Statement of<br />

Deviation” (Format- 3). If the tenderer has no exceptions, the annexure<br />

shall be submitted with a ―Nil‖ statement. If the tenderer does not include the<br />

annexure with the tender it shall be conclusive evidence that the special<br />

conditions of contract and technical requirement & specification and all<br />

conditions of contract are entirely acceptable to the Tenderer.<br />

(vi) Any deviations from these special conditions of contract, technical<br />

requirement & specifications if any, stated by the tenderer in his tender or<br />

subsequently introduced by the <strong>Railway</strong> shall be a part of the Contract only<br />

to such extent as have been explicitly accepted by the <strong>Railway</strong> and<br />

incorporated in the contract.<br />

4.2 NAME OF WORK<br />

Dividing of berthing track of loop line No. 02 & 03 in connection with<br />

avoiding frequent use of emergency operation of LC gate and shifting of<br />

LC-300 operating console in new duty bunk at Geratpur Station.<br />

For Sr. Divisional Signal & Telecom Engineer Page 18 of 68 Signature of Tenderer & Seal<br />

For and on behalf of President of India