Tender No.<br />
S&T/BRC/12-13/03 (Signal)<br />
DOWN LOADED FROM INTERNET<br />
CHAPTER 4: SPECIAL CONDITIONS OF CONTRACT<br />
4.1 GENERAL<br />
(i)<br />
These Special Conditions of Contract (SCC), "Schedule of Material &<br />
Works" and Technical Requirement & Specification and provision of tender<br />
document shall govern the works to be executed under this contract in<br />
addition to and/or in part super cession of the General Conditions of<br />
Contract (GCC) with latest amendment / Correction Slips and Standard<br />
Specifications as laid down in the <strong>Western</strong> <strong>Railway</strong> Works Hand Book, Part<br />
III as amended up to latest correction slips.<br />
(ii) Where there is any conflict between these Special Conditions of Contract on<br />
one hand and Standard Specifications and General Conditions of Contract<br />
of <strong>Western</strong> <strong>Railway</strong> on the other hand, the former (SCC) shall prevail.<br />
(iii) Any deviations from these Special Conditions of Contract, Technical<br />
Requirement & Specifications, Schedule of Material & Supplies and/or any<br />
condition of tender document, if any, stated by the tenderer in his tender or<br />
subsequently introduced by the <strong>Railway</strong> shall be a part of the Contract only<br />
to such extent as have been explicitly accepted by the <strong>Railway</strong> and<br />
incorporated in the contract.<br />
(iv) These specifications/documents describe the material to be supplied, work<br />
to be performed and the method of construction for the complete installation<br />
in strict accordance with the drawings and specifications mentioned herein<br />
and such instructions as may from time to time be given by the <strong>Railway</strong>. The<br />
contractor shall quote for work giving all information after close scrutiny of<br />
the plans and site survey.<br />
(v) Unless specifically provided otherwise in the tender, any and all exception,<br />
which the tenderer may have to any of the clauses of the special conditions<br />
of contract or, technical requirement & specification as included in the tender<br />
shall be clearly stated. Such exceptions shall be listed in “Statement of<br />
Deviation” (Format- 3). If the tenderer has no exceptions, the annexure<br />
shall be submitted with a ―Nil‖ statement. If the tenderer does not include the<br />
annexure with the tender it shall be conclusive evidence that the special<br />
conditions of contract and technical requirement & specification and all<br />
conditions of contract are entirely acceptable to the Tenderer.<br />
(vi) Any deviations from these special conditions of contract, technical<br />
requirement & specifications if any, stated by the tenderer in his tender or<br />
subsequently introduced by the <strong>Railway</strong> shall be a part of the Contract only<br />
to such extent as have been explicitly accepted by the <strong>Railway</strong> and<br />
incorporated in the contract.<br />
4.2 NAME OF WORK<br />
Dividing of berthing track of loop line No. 02 & 03 in connection with<br />
avoiding frequent use of emergency operation of LC gate and shifting of<br />
LC-300 operating console in new duty bunk at Geratpur Station.<br />
For Sr. Divisional Signal & Telecom Engineer Page 18 of 68 Signature of Tenderer & Seal<br />