Tender No.<br />
S&T/BRC/12-13/03 (Signal)<br />
DOWN LOADED FROM INTERNET<br />
(iii) It is an agreed term of the contract that the sum of money so withheld or<br />
retained under this clause by the purchaser will be kept withheld or retained<br />
as such by the purchaser till the claim arising out of or under any other<br />
contract is either mutually settled or determined by the Arbitrator if the other<br />
contract is governed by the Arbitration clause or by the competent court as<br />
the case may be, and the contractor shall have no claim for interest or<br />
damages in respect of any sum of money withheld or retained under this<br />
clause and duly notified to the contractor.<br />
4.44 INSURANCE OF MATERIALS & INSTALLATIONS<br />
The contractor shall take out and keep in force a policy or policies of Insurance<br />
for all materials including <strong>Railway</strong> supply materials equipment irrespective of<br />
whether used up in the portion of work already done or kept for the use in the<br />
balance portion of the work until such works are handed over to the <strong>Railway</strong>s.<br />
The Contractor shall not be liable for losses/damages to the materials either<br />
used up in the portion of work done or his material kept for use at site, in<br />
consequence of mutiny, or other similar causes over which the Contractor has no<br />
control and which cannot be insured. Such losses or damages shall be the<br />
liability of the <strong>Railway</strong>s and if required by the <strong>Railway</strong>s, be made good by the<br />
contractor, at the cost of the <strong>Railway</strong>s.<br />
The Contractor should, however, insure the stores brought to site, against risks<br />
in consequence of war and invasion, as required under the Emergency Risk<br />
(Goods) Insurance Act in force from time to time.<br />
It may be noted that the beneficiary of the insurance policy should be <strong>Railway</strong>s or<br />
the policies should be pledged in favour of <strong>Railway</strong>. The contractor shall keep<br />
the policy/policies current till the installations are handed over to the Purchaser.<br />
It may also be noted that in the event of contractor‘s failure to keep the policy<br />
current and alive, renewal of the policy will be done by the <strong>Railway</strong>s for which the<br />
cost of the premium plus 20% of premium shall be recovered from the contractor.<br />
For purpose of enabling the contractor to take the insurance cover in connection<br />
with this contract, the purchaser‘s engineer will advise the approximate price of<br />
all the <strong>Railway</strong>‘s supply materials to the contractor.<br />
4.45 ENGAGEMENT OF QUALIFIED ENGINEER<br />
1. The contractor shall employ the Engineer/Diploma holder, retired Senior<br />
Section Engineer (Signal)/Works Supervisor/Officer as under:<br />
Works costing up to 25 lakhs:- One Engineer/Supervisor.<br />
Works costing more than 25 lakhs & up<br />
Engineers/Supervisors.<br />
Works costing more than 75 lakhs:- Three<br />
Supervisor.<br />
to 75 lakhs:- Two<br />
Engineers/Technical<br />
For Sr. Divisional Signal & Telecom Engineer Page 44 of 68 Signature of Tenderer & Seal<br />
For and on behalf of President of India