The test should be carried out using a test instrument<br />

specifically designed for this purpose.<br />

• Operation of Residual Current Devices<br />

This test should be carried out on any such device using<br />

a test instrument specifically designed for this purpose.<br />

A test should be applied at the rated tripping current of<br />

the device and the operating time shall not exceed 40ms<br />

at a residual current of 150 mA.<br />

• Earth Electrode Resistance.<br />

This test is to be carried out in accordance with BS 7430.<br />

• Test Equipment<br />

All test equipment shall be tested and calibrated at<br />

regular planned intervals and no item of equipment shall<br />

be used for testing if test and calibration of the<br />

instrument is overdue.<br />

The instrument to be used for polarity and isolation<br />

testing should always be checked before use against a<br />

known 240 volt supply.<br />

2.8.6.17 AS BUILT DRAWINGS<br />

A set of "as built" drawings shall be provided by the Developer for the<br />

Engineer upon completion of the street lighting installation. All<br />

column positions and private underground cables installed or<br />

realigned for the works must be accurately recorded on these plans.<br />

If manufactured from tubular steel or circular section circumferential<br />

joints shall be of the sleeve type and restricted to points where the<br />

column is designed with reduced diameters. Joints will not be<br />

allowed between designed points of reduced diameter.<br />

2.8.7.2 WALL/ POLE BRACKETS AND CONTROL GEAR BOXES<br />

Wall brackets shall be constructed from steel tube and shall provide<br />

a mounting height of lantern above the carriageway and projections<br />

as specified. “Projection” is the distance measured horizontally from<br />

the wall to the end of the bracket. Brackets shall be provided with a<br />

back plate of adequate size and strength to permit secure attachment<br />

to buildings and to support the lamp and lantern required and shall<br />

be secure by rag bolts or other approved fixings. The brackets shall<br />

be designed to accept mineral insulated cable glands, when required.<br />

Control Gear Boxes shall be constructed of steel or corrosion<br />

resistant alloy and shall be large enough to afford easy access to the<br />

control equipment. Doors are to be fitted with tamper-proof locks of<br />

the same patterns as used for the columns if possible.<br />

A backboard of hardwood or other substantial non-hygroscopic material<br />

shall be fitted into each control box and shall be of sufficient size to<br />

accommodate all of the control equipment, service cable and cut-outs.<br />

Steel wall brackets and control gear boxes shall be hot dipped<br />

galvanised and shall be treated in every respect the same as for the<br />

steel columns, with regard to further protection from corrosion.<br />

The wall brackets and control gear boxes shall be provided with an<br />

earth terminal.<br />

2.8.7 EQUIPMENT SPECIFICATION AND INSTALLATION<br />

2.8.7.1 COLUMNS AND BRACKETS<br />

The lighting column manufacturer shall be registered with and<br />

certified by either BSI Quality Assurance Services, Lloyds Registered<br />

Quality Assurance Ltd, or SGS Yardsley, for the manufacture, supply<br />

and verification of lighting columns under their Quality Assessment<br />

Schedule to BS EN I SO 9000.<br />

Lighting columns and brackets shall be manufactured in compliance<br />

with BS EN 40 Part 1 and BS 5649 parts 2, 3, 5, 6, 7, 8 and 9.<br />

Standard steel columns and bracket arms shall be galvanised and<br />

suitable for the lanterns offered and of a design acceptable to the<br />

<strong>Design</strong> <strong>Council</strong> and the Engineer. Columns and brackets shall be<br />

supplied by the same manufacturer.<br />

Columns and bracket arms shall together provide a vertical mounting<br />

height measured from the centre of the light source to the<br />

Carriageway of 5, 6, 8 or 10 metres, or as agreed with the Engineer.<br />

Columns and bracket arms shall have no sharp or jagged edges which<br />

would foul or chafe internal wiring.<br />

The compartment in the base of each column shall be designed to<br />

accommodate control equipment of the lamp or lamps and the<br />

opening(s) in it shall afford easy access to the equipment. The<br />

compartment shall be fitted with weatherproof access door(s) having<br />

tamperproof lock(s) of the same pattern for all columns. A total of six<br />

keys to this lock shall be supplied to the Engineer. Doors shall be fitted<br />

with an earth stud to allow bonding to the main earth terminal. Each<br />

base compartment shall have a base board manufactured from<br />

material which is substantially non-hygroscopic not less than 15mm<br />

thick and of suitable size to accommodate the control equipment with<br />

adequate space at the bottom to accommodate cable terminations<br />

and service cut-outs. The baseboard shall be firmly fixed.<br />

Where agreed with the Engineer columns shall be fitted with a flange<br />

plate. The Developer shall ensure that the spacing of the flange plate<br />

holes and the position of the fixing bolts are compatible.<br />

44<br />

<strong>Kent</strong><br />

<strong>Design</strong><br />

2.8.7.3 EXCAVATION FOR COLUMNS<br />

Excavation for columns shall not be by mechanical means unless<br />

agreed by the Engineer.<br />

The sides of the pits and trenches shall where necessary be<br />

supported adequately at all times and shall be kept free of water.<br />

All excavated materials from such excavations not required for<br />

refilling shall be disposed of in tips provided by the Contractor.<br />

The Developer shall make good with suitable material or concrete<br />

ST2 mix as directed by the Engineer:-<br />

• Any excavation greater than that normally required for<br />

the installation of a column or cable.<br />

• Any additional excavation at or below the bottom of<br />

foundations to remove material which the Developer<br />

allows to become unsuitable.<br />

2.8.7.4 ERECTION OF COLUMNS AND BRACKETS<br />

The Developer shall take any necessary measures to minimise any<br />

disturbance and damage to any trees encountered during erection.<br />

The Developer shall obtain prior approval from the Engineer before<br />

felling, trimming and cutting roots of trees affected by the installation.<br />

Brackets shall be fitted to, and correctly aligned in relation to,<br />

columns before the columns are erected.<br />

The columns shall be carefully aligned and set vertically with doors facing<br />

away from on-coming traffic except where the columns are mounted<br />

behind parapets where the bottom of the door shall be above the<br />

parapet and the door shall be hinged or captive and face towards the<br />

carriageway, or unless otherwise directed by the Engineer. Columns<br />

without flanges shall be erected in a hole with sides as steep as soil<br />

conditions allow and with a clearance of I00mm at the butt end of the<br />

column. The depth shall be in accordance with the manufacturers<br />

instructions unless otherwise agreed with the Engineer. Concrete ST5<br />

mix shall be placed and compacted in 150mm layers to a depth of<br />

600mm above the butt end of the column or to the underside of the<br />

cable entry slot whichever is the greater. The cable entry slots shall be