Electrical Schematics (EST 100 ... - UAW-Chrysler.com
Electrical Schematics (EST 100 ... - UAW-Chrysler.com
Electrical Schematics (EST 100 ... - UAW-Chrysler.com
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
October 2003-September 2004<br />
4) Component Identification:<br />
Install, remove, and identify the functions of the following <strong>com</strong>ponents:<br />
Main Board (CPU), Remote I/O Boards, Device Net I/O Boards, Power Supply Board, Servo<br />
Amp, Servo Motors, Internal Robot Cables, Fuses, FROM, Backup Batteries, Process I/O Boards,<br />
Panel Board, Axis Control Board, MCC, Internal Controller Cables, Transformer, and Safety<br />
Circuit.<br />
5) Troubleshooting:<br />
Position, alarm and status screens, LED’s, robot inputs and outputs screen location, PLC to robot<br />
<strong>com</strong>munications, Fanuc block I/O modules, <strong>com</strong>munications, <strong>com</strong>mon electrical <strong>com</strong>ponents<br />
issues, and UOP input and output utilization.<br />
6) File Utilities<br />
Robot Core Software files and configuration, Teach pendant programs, application programs and<br />
system variables.<br />
35(5(48,6,7(6<br />
Participants should have previously attended Fanuc RJ2-RJ3 Operations and Programming (FRT<br />
300) or similar training that includes a general understanding of automation, <strong>com</strong>puters and electrical<br />
troubleshooting.<br />
&/$666,=(6 (2 per robot)<br />
&2856('85$7,2140 hours<br />
6(66,21'$7(6<br />
October 13-17<br />
December 8-12<br />
February 2-6<br />
March 22-26<br />
May 17-21<br />
June 21-25<br />
September 20-24<br />
40