Electrical Schematics (EST 100 ... - UAW-Chrysler.com
Electrical Schematics (EST 100 ... - UAW-Chrysler.com
Electrical Schematics (EST 100 ... - UAW-Chrysler.com
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
:(/',1*<br />
$'9$1&('6758&785$/67((/:(/',1*<br />
<br />
October 2003-September 2004<br />
&2856(:77<br />
&2856('(6&5,37,21<br />
The participant welds structural steel in all welding positions using the Shielded Metal Arc and Flux<br />
Cored Arc welding processes.<br />
/($51,1*287&20(<br />
Upon the successful <strong>com</strong>pletion of the course the participant should be able to:<br />
1. set up and adjust shielded metal arc welding equipment;<br />
2. set up and adjust flux cored arc welding equipment;<br />
3. prepare structural steel for welding;<br />
4. weld structural steel in all welding positions; and,<br />
5. weld <strong>com</strong>plete penetration fillet and groove welds in the vertical and overhead positions.<br />
&2856(2%-(&7,9(<br />
To provide participants with the ability to produce quality welds on structural steel in all welding<br />
positions.<br />
0$-25723,&6&29(5('<br />
• Electrode selection for welding structural steel welding with the SMAW process<br />
• Self shielded and gas shielded electrode wires for FCAW welding structural steel<br />
• Techniques for groove welds with and without backing<br />
• Visual and destructive weld examination<br />
35(5(48,6,7(6<br />
All participants should have <strong>com</strong>pleted Structural Steel Welding (WTT 200). In addition, all<br />
participants must meet one of the following requirements: <strong>com</strong>pletion of Welding Safety & Overview<br />
of Processes (WPT <strong>100</strong>), or certification from a welding safety course.<br />
&/$666,=(6<br />
&2856('85$7,21 40 hours<br />
6(66,21'$7(6<br />
October 27-31<br />
February 2-6<br />
May 24-28<br />
August 16-20<br />
88