12.10.2014 Views

Electrical Schematics (EST 100 ... - UAW-Chrysler.com

Electrical Schematics (EST 100 ... - UAW-Chrysler.com

Electrical Schematics (EST 100 ... - UAW-Chrysler.com

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

October 2003-September 2004<br />

:(/',1*<br />

:(/',1*&$67,521 <br />

NEW!<br />

&2856(:,7<br />

&2856('(6&5,37,21<br />

The participant learns what the requirements are to produce quality welds on cast iron.<br />

/($51,1*287&20(<br />

Upon the successful <strong>com</strong>pletion of the course, the participant should be able to:<br />

1. describe the five types of cast iron;<br />

2. prepare broken cast iron parts for welding;<br />

3. select the welding process most suitable for the repair;<br />

4. preheat cast iron;<br />

5. weld cast iron with both the shielded metal arc and oxy fuel welding processes; and,<br />

6. post heat and stress relieve cast iron after welding.<br />

&2856(2%-(&7,9(<br />

To provide participants with the ability to successfully repair weld broken or worn cast iron parts.<br />

0$-25723,&6&29(5('<br />

• Weldability of cast iron<br />

• Weld joint preparation for broken or worn cast iron parts<br />

• Shielded metal arc welding electrodes used on cast iron<br />

• Oxy fuel welding repairs on cast iron<br />

• Preheating, inter pass temperature, post heating and stress relieving cast iron<br />

35(5(48,6,7(6<br />

Welding Safety & Overview of Processes (WPT <strong>100</strong>) and<br />

Structural Steel Welding (WTT 200) or Basic Stick Welding (WBT 200)<br />

&/$666,=(6<br />

&2856('85$7,2140 hours<br />

6(66,21'$7(6<br />

October 13-17<br />

November 10-13*<br />

* Local Participants Only.<br />

March 1-5<br />

April 13-16*<br />

82

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!