Electrical Schematics (EST 100 ... - UAW-Chrysler.com
Electrical Schematics (EST 100 ... - UAW-Chrysler.com
Electrical Schematics (EST 100 ... - UAW-Chrysler.com
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
October 2003-September 2004<br />
:(/',1*<br />
:(/',1*&$67,521 <br />
NEW!<br />
&2856(:,7<br />
&2856('(6&5,37,21<br />
The participant learns what the requirements are to produce quality welds on cast iron.<br />
/($51,1*287&20(<br />
Upon the successful <strong>com</strong>pletion of the course, the participant should be able to:<br />
1. describe the five types of cast iron;<br />
2. prepare broken cast iron parts for welding;<br />
3. select the welding process most suitable for the repair;<br />
4. preheat cast iron;<br />
5. weld cast iron with both the shielded metal arc and oxy fuel welding processes; and,<br />
6. post heat and stress relieve cast iron after welding.<br />
&2856(2%-(&7,9(<br />
To provide participants with the ability to successfully repair weld broken or worn cast iron parts.<br />
0$-25723,&6&29(5('<br />
• Weldability of cast iron<br />
• Weld joint preparation for broken or worn cast iron parts<br />
• Shielded metal arc welding electrodes used on cast iron<br />
• Oxy fuel welding repairs on cast iron<br />
• Preheating, inter pass temperature, post heating and stress relieving cast iron<br />
35(5(48,6,7(6<br />
Welding Safety & Overview of Processes (WPT <strong>100</strong>) and<br />
Structural Steel Welding (WTT 200) or Basic Stick Welding (WBT 200)<br />
&/$666,=(6<br />
&2856('85$7,2140 hours<br />
6(66,21'$7(6<br />
October 13-17<br />
November 10-13*<br />
* Local Participants Only.<br />
March 1-5<br />
April 13-16*<br />
82