Electrical Schematics (EST 100 ... - UAW-Chrysler.com
Electrical Schematics (EST 100 ... - UAW-Chrysler.com
Electrical Schematics (EST 100 ... - UAW-Chrysler.com
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
October 2003-September 2004<br />
,1'8675,$/0$,17(1$1&(<br />
/$6(5/(9(/,1* &2856(/$7<br />
2 Hours<br />
&2856('(6&5,37,21<br />
The participant should be able to understand all safety aspects of working with laser leveling<br />
equipment; use appropriate math to calculate corrections using lasers and optical instruments; set<br />
up and operate laser and optical instruments; set up a transit; level industrial machinery; shoot grades<br />
and slopes; layout building perimeters; and use laser instruments to set piping.<br />
/($51,1*287&20(<br />
Upon successful <strong>com</strong>pletion of this course, the participant should be able to:<br />
1. understand all safety aspects of working with laser leveling equipment;<br />
2. use appropriate math to calculate corrections using lasers and optical instruments;<br />
3. set up and operate laser and optical instruments;<br />
4. set up a transit;<br />
5. level industrial machinery;<br />
6. shoot grades and slopes;<br />
7. layout building perimeters; and,<br />
8. use laser instruments to set piping.<br />
&2856(2%-(&7,9(<br />
The participant will have a practical knowledge of laser leveling necessary to install and maintain<br />
industrial equipment and machinery.<br />
0$,1723,&6&29(5('<br />
• Laser safety<br />
• Laser operation<br />
• Setting benchmarks<br />
• Correcting existing equipment<br />
• Methods for machine alignment<br />
• Methods for leveling<br />
35(5(48,6,7(6None<br />
&/$666,=(8<br />
&2856('85$7,2140 Hours<br />
6(66,21'$7(6<br />
October 20-24 November 17-21 December 15-19<br />
January 5-9 April 19-23 July 19-23<br />
February 23-27 May 10-14 August 16-20<br />
March 15-19 June 7-11 September 27-October 1<br />
64