Disaster Risk Management For Coastal Tourism Destinations - DTIE
Disaster Risk Management For Coastal Tourism Destinations - DTIE
Disaster Risk Management For Coastal Tourism Destinations - DTIE
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Disaster</strong> <strong>Risk</strong> <strong>Management</strong> <strong>For</strong> <strong>Coastal</strong> <strong>Tourism</strong> <strong>Destinations</strong> Responding To Climate Change<br />
A Practical Guide <strong>For</strong> Decision Makers<br />
<br />
Signaling the end of the plan development process;<br />
<br />
<br />
Announcing the actions required for plan implementation.<br />
Providing the plan with much greater authority than a draft document<br />
or interim guidance through mechanisms such as an executive order,<br />
resolution, or legislative action, as required.<br />
The plan should be formally approved by the most senior local authority to provide<br />
the patronage and political support so necessary for successful plan implementation.<br />
5<br />
5.2.5<br />
Continuous Review Process<br />
The plan should not be considered a static document but will need to be<br />
continuously updated and revised over time to address:<br />
<br />
<br />
<br />
The lessons learned and the need for continuous improvement;<br />
Fundamental changes to the local disaster management organizational<br />
structure;<br />
<br />
The plan should also specify the time frames and procedures for amendment and<br />
periodic revision, and include a strategy with associated budgets for strengthening<br />
the institutional capacity for preparedness planning, training, and response.<br />
5.3<br />
Essential Elements of a Comprehensive Preparedness Plan<br />
The following points illustrate the essential components of local disaster<br />
preparedness plans:<br />
1) Early Warning Systems: Warnings should be timely, authoritative, and<br />
precise. Whether a disaster or emergency comes with little or no warning,<br />
or whether, as in the case of a tropical cyclone, they are preceded by<br />
advance notice, mechanisms need to be in place to address the following<br />
considerations:<br />
<br />
<br />
<br />
First, the problem must be detected, and then the threat level must be<br />
accurately evaluated and articulated;<br />
Next, a decision must be made about what to do and when; and,<br />
Finally that decision must be acted on – only then should public warnings be<br />
issued.<br />
In addition, the plan should include an Alert Scheme or mechanism to trigger<br />
the plan. This describes how information is transmitted throughout the<br />
scheme to alert all responsible operational units. Also required is a procedure<br />
<br />