23.10.2014 Views

ANNEX II - UNOPS

ANNEX II - UNOPS

ANNEX II - UNOPS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

10.1 Types of CEC for deployment of Contractors<br />

There shall be two types of CEC for deployment of Contractors under the under the Agreement and<br />

respective Call-Off Contract(s): A retainer CEC and a regular CEC. Each CEC type and the purpose of its<br />

use is explained below:<br />

10.1.1 A retainer CEC shall be issued for a period of time during which the services of the Contractor are<br />

expected intermittently. The CEC on retainer basis will specify a “unit price” (e.g. hourly, daily fee<br />

or monthly fee) and payments for the actually rendered services shall be made at the end of each<br />

calendar month, or as otherwise agreed by <strong>UNOPS</strong> and the Consultant. For budgetary purposes, a<br />

monetary cap will be determined when the respective Call-Off Contract under the Agreement is<br />

awarded to the Consultant.<br />

10.1.2 Contractors’ CEC other than retainer CEC shall be referred to as regular CEC. Regular CEC shall be<br />

issued when services are required on a continuous basis throughout the contract period and payments<br />

shall be made at the end of each calendar month, or as otherwise agreed by <strong>UNOPS</strong> and the<br />

Consultant. Regular CEC shall be divided into two types according to the duration of contract<br />

period:<br />

(i) CEC of less than one month; and<br />

(ii) CEC of one month or longer<br />

10.2 CEC issuance<br />

10.2.1 A number of administrative and other actions shall be taken by the Consultant prior to CEC issuance<br />

to the Contractor, including but not limited to obtainment of:<br />

(i) Medical Statement of Fitness, and<br />

(ii) Evidence of medical insurance for ICs with contracts of one or more month, and<br />

(iii) Complete a Designation of Beneficiary form.<br />

It shall be the selected candidate’s responsibility to comply with the requirements listed above prior<br />

to becoming a Contractor and the Consultant shall be responsible for enforcing this instruction and<br />

for keeping proper records of the documentation for each deployed Contractor.<br />

10.2.2 The Consultant shall ensure that issued CEC fully comply with the “Terms and Conditions for<br />

deployment of Consultant’s Contractors” and any other terms and conditions of the Agreement and<br />

respective Call-Off Contract.<br />

10.2.3 Contractors will be under the supervision of <strong>UNOPS</strong>, which means that Contractors shall be<br />

receiving their day-to-day work-related instructions from their <strong>UNOPS</strong> Managers (as shall be<br />

stipulated in Contractor’s TOR). This requirement shall be accordingly reflected in each CEC issued<br />

by the Consultant. The impact of this meaning on the requirement to provide professional liability<br />

insurance is taken into consideration through amendment of Article 27 of the General Conditions for<br />

<strong>UNOPS</strong> Contracts for Professional Services (Annex IV-C) as stipulated in the sub-article c, Article<br />

2, Section I of the model Agreement.<br />

10.2.4 <strong>UNOPS</strong> reserves the right to request a copy of each CEC for verification of the above stated<br />

requirements.<br />

10.3 Amendment and Extension of CECs<br />

Any modification to CEC shall require a prior amendment of the respective Call-Off Contract under the<br />

Agreement in writing between the Consultant and <strong>UNOPS</strong> duly signed by the authorized representatives of<br />

the Consultant and the <strong>UNOPS</strong>.<br />

Page 31 of 61

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!