23.10.2014 Views

ANNEX II - UNOPS

ANNEX II - UNOPS

ANNEX II - UNOPS

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4. EXPECTED OUTPUTS: SUMMARY OF SERVICES<br />

4.1. Summary of Services<br />

Upon signature of the prospective Agreement <strong>UNOPS</strong> will request the Consultant to deploy the Contractors,<br />

as needs arise, for the fulfilment of specific tasks and performance of specific duties under various positions<br />

that include, but not limited to, the following:<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

<br />

Project management (administrative support to government entities, infrastructure rehabilitation,<br />

construction of horizontal & vertical structures, governance, human rights, rule of law,<br />

constitutional outreach, support to civil society, etc);<br />

Construction supervision (both vertical & horizontal structures);<br />

Engineering (roads, QC, QA, de-mining, civil, structural, drainage, etc);<br />

Logistical support and facilities’ management;<br />

Security services (coordination, supervision, advisory, training, close protection);<br />

Medical services;<br />

Community development (trainings, labour intensive programmes);<br />

Grants management and monitoring;<br />

Civil society support projects’ monitoring & evaluation;<br />

Communications and IT;<br />

Data collection.<br />

Please note:<br />

Samples of Contractor’s Terms of References and qualifications’ requirements for possible positions<br />

are given in the Annex <strong>II</strong>-B of this document.<br />

The positions are not limited to the list provided above. The Consultant shall be responsible to provide<br />

suitably qualified Contractors for any and all positions that may be required by <strong>UNOPS</strong>.<br />

As needs for any position arise, <strong>UNOPS</strong> Hiring Unit will draft the Contractor’s Terms of Reference<br />

according to its requirements and will communicate its request to the Consultant. Such request shall be in<br />

writing in the form attached as Annex <strong>II</strong>-C, specifying the category and level of the required Contractors,<br />

location of the project, the duration of the requirement for the Contractor(s), the draft Terms of Reference<br />

outlining functional and qualifications requirements for the Contractor(s) and the proposed fee for the<br />

Contractor(s).<br />

Any order against the prospective Agreement shall be made by formal Call-Off Contract(s) issued to the<br />

Consultant by an authorized representative of <strong>UNOPS</strong>. The Call-Off Contract shall set out the terms and<br />

conditions for the delivery of the services. Each Call-Off Contract shall make reference to the prospective<br />

Agreement.<br />

The Consultant shall be aware of the following mandatory procedural safeguards that shall come into force<br />

upon signature of the Agreement by both parties:<br />

a. If the Consultant deploys one or more of its Contractors to work for a given <strong>UNOPS</strong> project under<br />

the Agreement and respective Call-Off Contract(s), the Consultant shall not be eligible to bid for<br />

supply of goods, services or works for that project, or any other projects where the Consultant may<br />

have obtained an advantage by reason of the deployment of its Contractors with <strong>UNOPS</strong>.<br />

b. If a contract for supply of goods, services or works for a project is awarded to a company which<br />

subsequently is identified as the successful Offeror under this RFP, the Consultant's Contractors will<br />

not be eligible for deployment under that project until such time when subject contract for supply of<br />

goods, services or works is completed.<br />

<strong>UNOPS</strong> shall have no obligation to request the Consultant to provide either any minimum number of<br />

Contractors or a minimum volume of services during the term of the prospective Agreement.<br />

Page 4 of 61

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!