3.1. Product quality specifications (Step 1)<br />

The following steps need to be taken in this phase <strong>of</strong> the design procedure (see Figure<br />

6):<br />

3.1.1. Click on the comm<strong>and</strong> button “1. Product quality specifications”<br />

3.1.2. Write the number <strong>of</strong> products in the allocated place (cell C5 <strong>of</strong> the spreadsheet).<br />

3.1.3. Click on the comm<strong>and</strong> button, “Next” <strong>and</strong> write the name <strong>of</strong> the products in the<br />

allocated place (starting from cell C6 <strong>of</strong> the spreadsheet).<br />

3.1.4. Click on the comm<strong>and</strong> button, “List the specifications” <strong>and</strong> type the<br />

specifications <strong>of</strong> each product in the allocated place.<br />

After completing Step 1, click on the comm<strong>and</strong> button “2. Process specifications” to<br />

proceed to the next step <strong>of</strong> the design procedure.<br />

Figure 6: Product quality specifications<br />

3.2. Process specifications (Step 2)<br />

The following steps need to be taken in this phase <strong>of</strong> the design procedure (see Figure<br />

7):<br />

3.2.1. Write the path <strong>of</strong> the directory containing the knowledge base (e.g.<br />

D:/<strong>PAT</strong>/knowledge base.xls) in the provided text box (the browse option can be<br />

used to search the file <strong>and</strong> copy the directory <strong>of</strong> file) <strong>and</strong> click on the comm<strong>and</strong><br />

button, “Load Knowledge base”.<br />

3.2.2. Click on the comm<strong>and</strong> button, “Select the <strong>process</strong>” <strong>and</strong> select the <strong>process</strong> from<br />

the drop-down list <strong>for</strong> which the <strong>PAT</strong> system has to be designed. Select the option<br />

‘Not found’, if the <strong>process</strong> is not found in the list.<br />