ICAS-PAT manual for Design of process monitoring and ... - CAPEC
ICAS-PAT manual for Design of process monitoring and ... - CAPEC
ICAS-PAT manual for Design of process monitoring and ... - CAPEC
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
3.1. Product quality specifications (Step 1)<br />
The following steps need to be taken in this phase <strong>of</strong> the design procedure (see Figure<br />
6):<br />
3.1.1. Click on the comm<strong>and</strong> button “1. Product quality specifications”<br />
3.1.2. Write the number <strong>of</strong> products in the allocated place (cell C5 <strong>of</strong> the spreadsheet).<br />
3.1.3. Click on the comm<strong>and</strong> button, “Next” <strong>and</strong> write the name <strong>of</strong> the products in the<br />
allocated place (starting from cell C6 <strong>of</strong> the spreadsheet).<br />
3.1.4. Click on the comm<strong>and</strong> button, “List the specifications” <strong>and</strong> type the<br />
specifications <strong>of</strong> each product in the allocated place.<br />
After completing Step 1, click on the comm<strong>and</strong> button “2. Process specifications” to<br />
proceed to the next step <strong>of</strong> the design procedure.<br />
Figure 6: Product quality specifications<br />
3.2. Process specifications (Step 2)<br />
The following steps need to be taken in this phase <strong>of</strong> the design procedure (see Figure<br />
7):<br />
3.2.1. Write the path <strong>of</strong> the directory containing the knowledge base (e.g.<br />
D:/<strong>PAT</strong>/knowledge base.xls) in the provided text box (the browse option can be<br />
used to search the file <strong>and</strong> copy the directory <strong>of</strong> file) <strong>and</strong> click on the comm<strong>and</strong><br />
button, “Load Knowledge base”.<br />
3.2.2. Click on the comm<strong>and</strong> button, “Select the <strong>process</strong>” <strong>and</strong> select the <strong>process</strong> from<br />
the drop-down list <strong>for</strong> which the <strong>PAT</strong> system has to be designed. Select the option<br />
‘Not found’, if the <strong>process</strong> is not found in the list.<br />
10