Figure 13b: Interdependency analysis<br />
3.6. Per<strong>for</strong>mance analysis <strong>of</strong> <strong>monitoring</strong> tools (Step 6)<br />
The following steps need to be taken in this phase <strong>of</strong> the design procedure (see Figure<br />
14):<br />
3.6.1. Click on the comm<strong>and</strong> button, “Select a <strong>process</strong> point”, <strong>and</strong> select a <strong>process</strong><br />
point from the adjacent drop-down list (note that the <strong>process</strong> point selected in this<br />
step must be identical to the <strong>process</strong> point selected in Step 4).<br />
3.6.2. Click on the comm<strong>and</strong> button, “Select a critical <strong>process</strong> variable”, <strong>and</strong> select a<br />
critical <strong>process</strong> variable (or select all) from the adjacent drop-down list (see<br />
Figure 14). Follow steps 3.6.2.1-3.6.2.2:<br />
3.6.2.1. Tick on the per<strong>for</strong>mance criteria <strong>of</strong> the <strong>monitoring</strong> tools that you want to list (see<br />
Figure 14)<br />
3.6.2.2. Click on the comm<strong>and</strong> button, “List the <strong>monitoring</strong> tools” (see Figure 14). This<br />
comm<strong>and</strong> will generate a table containing the monitored variable, <strong>monitoring</strong><br />
techniques, <strong>monitoring</strong> tools <strong>and</strong> corresponding specifications. The user can<br />
modify this table according to his/her needs.<br />