ICAS-PAT manual for Design of process monitoring and ... - CAPEC
ICAS-PAT manual for Design of process monitoring and ... - CAPEC
ICAS-PAT manual for Design of process monitoring and ... - CAPEC
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
4. Data management<br />
The Following options are available <strong>for</strong> data management:<br />
4.1. Save workbook<br />
• Write the directory name where you want to save the workbook <strong>and</strong> click on the<br />
comm<strong>and</strong> button, “Save the workbook”.<br />
• Save the result <strong>of</strong> each analysis step: write the name <strong>of</strong> the directory where you<br />
want to save the result <strong>and</strong> click on the comm<strong>and</strong> button, “Save the result”.<br />
4.2. Build report in MS Word<br />
Click on the comm<strong>and</strong> button, “Build report in MS Word” to make a report in MS<br />
Word as given in Appendix A.<br />
Figure 20: Final <strong>process</strong> <strong>monitoring</strong> & analysis system<br />
27