ICAS-PAT manual for Design of process monitoring and ... - CAPEC
ICAS-PAT manual for Design of process monitoring and ... - CAPEC
ICAS-PAT manual for Design of process monitoring and ... - CAPEC
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Data management (interdependency analysis)<br />
• To save the interdependency analysis data, write the path <strong>of</strong> the directory where<br />
the data has to be saved <strong>and</strong> click on the comm<strong>and</strong> button, “Save simulation data<br />
(interdependency analysis)” (see Figure 13a).<br />
• To load the saved data click on the comm<strong>and</strong> button, “Load the saved data<br />
(interdependency analysis)” (see Figure 13a).<br />
After completing step 5 <strong>for</strong> the selected <strong>process</strong> point, click on the comm<strong>and</strong> button “6.<br />
Per<strong>for</strong>mance analysis <strong>of</strong> <strong>monitoring</strong> tools” to proceed to the next step <strong>of</strong> the design<br />
procedure.<br />
Figure 13a: Interdependency analysis<br />
18