27.10.2014 Views

ICAS-PAT manual for Design of process monitoring and ... - CAPEC

ICAS-PAT manual for Design of process monitoring and ... - CAPEC

ICAS-PAT manual for Design of process monitoring and ... - CAPEC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Data management (interdependency analysis)<br />

• To save the interdependency analysis data, write the path <strong>of</strong> the directory where<br />

the data has to be saved <strong>and</strong> click on the comm<strong>and</strong> button, “Save simulation data<br />

(interdependency analysis)” (see Figure 13a).<br />

• To load the saved data click on the comm<strong>and</strong> button, “Load the saved data<br />

(interdependency analysis)” (see Figure 13a).<br />

After completing step 5 <strong>for</strong> the selected <strong>process</strong> point, click on the comm<strong>and</strong> button “6.<br />

Per<strong>for</strong>mance analysis <strong>of</strong> <strong>monitoring</strong> tools” to proceed to the next step <strong>of</strong> the design<br />

procedure.<br />

Figure 13a: Interdependency analysis<br />

18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!