27.10.2014 Views

ICAS-PAT manual for Design of process monitoring and ... - CAPEC

ICAS-PAT manual for Design of process monitoring and ... - CAPEC

ICAS-PAT manual for Design of process monitoring and ... - CAPEC

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

3.6.3. Grading <strong>of</strong> <strong>monitoring</strong> tools: select the variable from the drop-down list (or select<br />

all) <strong>and</strong> Click on the comm<strong>and</strong> button, “Grade the <strong>monitoring</strong> tools” (see Figure<br />

14). This comm<strong>and</strong> will assign a grade in the range 5 to 1 to the top 5 <strong>monitoring</strong><br />

tools in the category <strong>of</strong> the selected specification, whereas the rest <strong>of</strong> the tools<br />

will get the grade zero. Note also that in case the value <strong>of</strong> any specification <strong>of</strong> a<br />

<strong>monitoring</strong> tool is not assigned (e.g. because no in<strong>for</strong>mation was available in the<br />

literature, then that <strong>monitoring</strong> tool will automatically get the grade zero (see<br />

Figure 15).<br />

3.6.4. Selection <strong>of</strong> <strong>monitoring</strong> tool: select a critical <strong>process</strong> variable (or select all) from<br />

the drop-down list <strong>and</strong> follow steps 6.4.1-6.4.2 (see Figure 14):<br />

3.6.4.1.Click on the comm<strong>and</strong> button, “Select per<strong>for</strong>mance criteria” <strong>and</strong> select the<br />

criteria on the basis <strong>of</strong> which the <strong>monitoring</strong> tool has to be selected. Note that the<br />

choice <strong>of</strong> the final selected <strong>monitoring</strong> tools will depend on the selected<br />

per<strong>for</strong>mance criteria!<br />

3.6.4.2.Click on the comm<strong>and</strong> button, “Select <strong>monitoring</strong> tool”.<br />

3.6.5. Repeat step 3.6.2-3.6.4 <strong>for</strong> each critical <strong>process</strong> variable involved with the<br />

selected critical <strong>process</strong> point. Result <strong>of</strong> this step is stored in result section (not<br />

shown).<br />

After completing the step 6 <strong>for</strong> the selected <strong>process</strong> point, click on the comm<strong>and</strong> button<br />

“7. Proposed <strong>process</strong> <strong>monitoring</strong> <strong>and</strong> analysis system” to proceed to the next step <strong>of</strong><br />

the design procedure.<br />

20

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!