LINE SET INSTALLATION<br />

A universal line set adapter kit, part number OS-QUICK, is<br />

available if you need to field engineer your line set. Both<br />

lines should be insulated separately the entire length of run.<br />

The refrigerant charge for a new unit is distributed between<br />

the unit head and the URC condenser. The line set has a<br />

minimal holding charge of 15 to 30 psig refrigerant vapor.<br />

If you need to field engineer your line set or shorten/<br />

lengthen a precharged line set you can do so by following<br />

these steps:<br />

1. Using the OS-QUICK kit, braze the line set connections.<br />

(If you shorten or lengthen a precharged line<br />

set, recover the holding charge, cut or lengthen and<br />

braze the connections.)<br />

2. Pressurize the lines and leak check all braze joints.<br />

3. Evacuate the lines through the service ports on the<br />

Aeroquip quick connect fittings.<br />

4. Charge both lines with 15 to 30 psig R-404A vapor.<br />

To make Aeroquip connection to the unit head and<br />

condenser:<br />

1. Lubricate the threads and O-ring with clean<br />

refrigerant oil.<br />

2. Tighten the female connector until it bottoms out.<br />

Note: Always use a back up wrench when tightening<br />

these fittings.<br />

3. Then turn an additional 1/4 turn to assure a good<br />

brass to brass seal. Leak check the joints with soap<br />

bubbles or an electronic leak detector.<br />

14<br />

12/01/02 12/20/03<br />