04.11.2014 Views

TECH - SPEC'S Technician's Pocket Guide - Hoshizaki America, Inc.

TECH - SPEC'S Technician's Pocket Guide - Hoshizaki America, Inc.

TECH - SPEC'S Technician's Pocket Guide - Hoshizaki America, Inc.

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

not starting freeze cycle, check defrost<br />

completion timer adjustment, thermistor for open<br />

circuit, discharge line temperature, C efficiency,<br />

and if HGV is fully open.<br />

C) Freeze cycle – C remains energized, PM, (LV<br />

on RS model), and FM energize…WV & HGV<br />

de-energize. Unit is held in freeze by 5 minute<br />

short cycle protection timer. After 5 minutes<br />

freeze cycle operation to transferred to FS for<br />

freeze termination. During first 5 minutes of<br />

freeze, confirm that evaporator temperature<br />

drops. After 7 minutes in freeze, remove black<br />

FS lead from K5 connector…Unit should<br />

immediately switch to pump out cycle.<br />

Diagnosis: If evaporator is not cold, check for HGV<br />

still open, TXV not opening properly, WV<br />

continuing to fill reservoir, improper unit pres<br />

sures, and inoperative C. If unit remains in freeze<br />

with FS removed replace board. * Normal freeze<br />

cycle will last 20 ~ 40 minutes depending on<br />

model and conditions. Cycle times and<br />

pressures should follow performance data<br />

provided in Tech –Specs.<br />

D) Pump Out Cycle – (10/20 second pump out)<br />

C remains energized, HGV energizes, FM deenergizes,<br />

PM stops for 2 seconds and starts in<br />

reverse rotation for 10/20 seconds.( This<br />

removes contaminants from the water reservoir<br />

through check valve and down the drain and<br />

allows for power flush of FS.) Check clear<br />

tubing at check valve housing or unit drain for<br />

water flow.<br />

Diagnosis: If PM does not reverse, check PM circuit<br />

and capacitor. If water does not pump out,<br />

remove housing and check/clean valve<br />

assembly.<br />

E) Normal Harvest Cycle –same as Initial Harvest<br />

Cycle – Return to B)…* Unit continues to cycle<br />

through B)…C)…& D) (Setting can be adjusted<br />

to skip D until every 2, 5, of 10 cycles)…until bin<br />

control is satisfied or power is switched OFF.<br />

• Unit always restarts at A).<br />

Legend:<br />

C – Compressor CC – Contactor Coil FM – Condenser Fan Motor<br />

FS – Float Switch HGV – Hot Gas Valve LV – Line Valve<br />

PM – Pump Motor RS – Remote System WV – Inlet Water Valve<br />

36<br />

12/01/02 12/20/03<br />

2/20/03

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!