11.11.2014 Views

Tips for Field Worker s Vol 2 - Vanbandhu Kalyan Yojana

Tips for Field Worker s Vol 2 - Vanbandhu Kalyan Yojana

Tips for Field Worker s Vol 2 - Vanbandhu Kalyan Yojana

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

SWA-SHAKTI<br />

Different activities corresponding to the age of the SHG<br />

0-12 months 12-18 months 18-24 months 24+months<br />

Group <strong>for</strong>mation Micro-enterprise Networking Networking<br />

development (On<br />

(strengthening<br />

Farm and non-farm)<br />

of federations)<br />

Initial Training Bank Linkage Improving State specific<br />

in group credit activities –<br />

<strong>for</strong>mation, etc.<br />

absorption<br />

Land Improvement<br />

and work on natural<br />

resource management<br />

Insurance<br />

Work on atrocities<br />

against women<br />

Working on right to<br />

in<strong>for</strong>mation towards<br />

promoting organizational<br />

transparency and<br />

accountability<br />

Confidence- Networking State-specific<br />

building (cluster <strong>for</strong>mation) activities<br />

Health<br />

Adolescent<br />

girls<br />

Networking<br />

with Panchayati<br />

Raj institutions<br />

Animal<br />

Theme camps Convergence Husbandry<br />

Literacy Integration of gender<br />

issues in project<br />

activities<br />

Communication & *State-specific<br />

Identity<br />

activities<br />

Community<br />

involvement<br />

through community<br />

asset creation<br />

Literacy<br />

Starting crèches<br />

Drudgery reduction<br />

Note:<br />

The State-specific initiatives do not have to be ta ken up necessarily in the phase where they have been mentioned.<br />

Depending on the preparedness of the State machinery, any of the above mentioned initiatives could be undertaken<br />

in any phase.<br />

The project will come to a close in May 2004. However, the recent mid-term review discussions have given rise<br />

to the possibility of initiating Swa-Shakti Phase II after May 2004, based on an evaluation of project accomplishments<br />

in participating states.<br />

7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!