eing planned, including doubling of lanes on the Karachi-Thatta-Hyderabad section of the<br />

National Highway and making investments in the infrastructure of Thatta city.<br />

9.2 Conceptual Design<br />

As with any project design, the master planners first set out the objectives of the development<br />

project in order to identify the outputs that would need to be identified in the development.<br />

The key elements that were considered were as follows:<br />

► Creation of a gated facility to ensure a secure destination.<br />

►<br />

►<br />

►<br />

►<br />

Structuring of design development to maintain the <strong>Project</strong>’s financial viability.<br />

Create a national tourist attraction by promoting public facilities and keeping the<br />

exclusiveness indifferent.<br />

Ensuring efficient utilization of the land bank with key focus being on conservation of<br />

natural habitat.<br />

Effectively apply sewerage, waste water treatment and solid waste management<br />

strategies keeping in mind that <strong>Keenjhar</strong> <strong>Lake</strong> is a water reservoir and a wetland of<br />

international importance.<br />

To achieve the above, Meinhardt carried out an analysis of several resorts in and around the<br />

region, many of which were Meinhardt projects. In addition, resorts developed at Ramsar<br />

sights in different parts of the world were also examined to draw inferences from.<br />

The key features identified as the main elements that were also incorporated in the<br />

conceptual design were as follows:<br />

► Integration: Different segments of the resort should be linked through a circulation spine<br />

to create a conglomerate whole.<br />

► Tools for Segregation: Golf Course to act as a buffer, separating the residential land<br />

parcels from other components.<br />

► Value Addition: The residential parcel should face either the Golf Course or the Water<br />

Front.<br />

► Security: Single point of entry, leading to limited access of the site.<br />

► Engagement of the Shoreline: Maximized exposure to water through the creation of<br />

water inlets to break the land mass and through isolation of the land.<br />

► Long-term Stay: Long-term stay is encouraged through a high percentage of different<br />

types of residential plots and the provision of amenities and commercial activities.<br />

Based on this analysis and the <strong>Project</strong> objectives, the following conceptual design was<br />

developed, which brought in all the components required in the <strong>Project</strong>. The initial steps<br />

include creation of security check, followed by engagement of the shoreline by maximizing<br />

exposure through creation of water inlets. The image below illustrates the sub-zoning analysis<br />

with key legends.<br />

41<br />