14.4 <strong>Investment</strong> Analysis<br />
Based on the financial assumptions described above, the <strong>Project</strong> yields a <strong>Project</strong> IRR of 17.7% and<br />
Equity IRR of 22.8%. Simple payback is estimated to be achieved by 9 th year, i.e. 5 th year of operational<br />
period which is very healthy when compared with regional benchmarks on tourism projects followed by<br />
reduced upfront investment.<br />
14.4.1 Upside Potential<br />
The following factors are expected to contribute towards enhancing project returns over the base lines<br />
estimates presented above:<br />
1. Reduced upfront payment against Quoted Bid Amount (QBA): The transaction structure<br />
being envisaged proposes a low cost deferred payment facility option whereby initial payment<br />
by selected bidder to be limited to only 20% of QBA.<br />
2. Exit Options: Exit options are available from start of the project, subject to certain conditions<br />
relating to maximum dilution levels.<br />
3. Modification of development outlays: Development outlays can be further reduced in the<br />
initial phase of development since the initial phase would focus on Infrastructure Development,<br />
which is expected to have significant lower cost/ outlays than those required in the finishing<br />
stages of the project.<br />
4. Recreation zone: Flexibility is available on the design and development of 200 acre Recreation<br />
Zone component with an added option for the developer to enter into sub-concession or subcontract<br />
arrangement(s) with the third parties.<br />
5. Option to modify non-essential facilities: Developer shall have the option to modify the nonessential<br />
components such as Walk-up apartments and farmhouse villas into hospitality<br />
components and may be able award sub-concessions for those components, as long as such<br />
modifications do not contradict the overall theme of the Conceptual Master Plan.<br />
6. Walkup- Apartment: Cash flows from walk-up apartments have not been factored into the<br />
baseline project returns.<br />
70<br />
<strong>Keenjhar</strong> <strong>Lake</strong> <strong>Resort</strong> <strong>Project</strong> - <strong>Project</strong> Information Memorandum