Apart from the <strong>Resort</strong> component, the convention centre and the golf course, a certain amount of<br />

flexibility will be available to developers to suggest other alternative development mix or use<br />

strategies, which shall be examined for assessment of commercial viability, its impact on the<br />

conceptual master plan and for its environmental impact.<br />

10.3 Development Package II<br />

The Development Package II (the “DP-II”), also referred to as Recreational Zone Development,<br />

relates to the costs for the establishment of integrated commercial and recreational facilities within the<br />

<strong>Project</strong>.<br />

The development to be undertaken in the DP-II includes medium level hotel/ lodging area, retail<br />

complex, theme parks, water parks, amusement parks, amphitheatre, museum, boating club,<br />

Cineplex, etc.<br />

The inclusion of this recreational zone is to provide visitors with activities to undertake when visiting<br />

the <strong>Keenjhar</strong> <strong>Lake</strong> site. This in turn makes the case for longer stays at the lake and hence increases<br />

the money that visitors are likely to spend, thereby contributing to the <strong>Project</strong>’s commercial viability.<br />

It is envisaged that the <strong>Project</strong> site will only develop once there is reasonable development and<br />

access to roadsand at least partial development of the resort is complete. It may not be feasible to<br />

expect investment in theme parks and amusement zones to be made in a completely undeveloped<br />

area. The developer would therefore have the flexibility to either develop and operate this parcel on<br />

their own, subject to detailed design and a development plan that would be approved by an<br />

independent engineer (the “IE”), or grant a sub-concession or even sub-contract the development of<br />

various components of the recreation zone.<br />

The table below delineates the allotment of the total area for DP-II i.e. 200 acres:<br />

Table: Land area utilized & percentages<br />

Component Area (Acres) %<br />

Amusement Park 21 11%<br />

Amenities – Utilities 12 6%<br />

Theme Park 22 11%<br />

Motel / lodging area 6 3%<br />

Boating club, Restaurant area 7 4%<br />

Cineplex, Retail & Gaming zones 5.5 3%<br />

Water Park 18 9%<br />

Open area / allocable area 108.5 54%<br />

Total 200 100%<br />

The construction of DP-II is planned to be completed during a 36 month period coinciding with the<br />

completion of the DP-I development. Both <strong>Project</strong> phases complement each other in terms of their<br />

commercial viability.<br />

47<br />

<strong>Keenjhar</strong> <strong>Lake</strong> <strong>Resort</strong> <strong>Project</strong> - <strong>Project</strong> Information Memorandum

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!