13.11.2014 Views

Keenjhar Lake Resort Project - Sindh Board Of Investment ...

Keenjhar Lake Resort Project - Sindh Board Of Investment ...

Keenjhar Lake Resort Project - Sindh Board Of Investment ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Recreation zone<br />

The developer has significant flexibility with regard to this development package. The area shall only<br />

be used for commercial activities, i.e. no farmhouses or residential component shall be included. The<br />

following development components have been identified in this development, but additional elements<br />

are permitted if the developer/resort operator deems appropriate:<br />

Entertainment zone:<br />

1. Theme Park<br />

2. Amusement Park<br />

3. Water Park<br />

4. Food Court<br />

5. <strong>Lake</strong>side pier, with boating, sailing and other eco-friendly water sports in a limited lake area<br />

annexed to this zone<br />

6. Indoor games (bowling, gaming zone, etc.)<br />

7. Museum<br />

8. Other entertainment facilities deemed appropriate<br />

Commercial District<br />

1. Medium cost hotels/motels/<br />

2. Shopping malls, with food courts, and Cineplex<br />

3. High street with shops for local souvenirs and handicrafts<br />

4. Indoor Restaurants<br />

5. <strong>Lake</strong> side pier, with provisions for managing waste disposal so as to ensure that the lake is<br />

not polluted.<br />

Master planning and development plan<br />

The developer shall be expected to have a detailed design and feasibility report for this development<br />

within six months of signing the Concession Agreement and shall submit its business plan, indicating<br />

the components in the entertainment zone, to the GoS through a special purpose vehicle company to<br />

be established by the GoS for the <strong>Project</strong> (the “<strong>Keenjhar</strong> <strong>Project</strong> Company”). Master planners<br />

specialising in the development of theme parks should be selected for development of the master<br />

plans for this <strong>Project</strong> to ensue that matters relating to international safety, health and environmental<br />

standards are complied with and kept in the design philosophy. In case a resort operator of<br />

international repute is brought in as a development partner, their master plan for the development<br />

would be acceptable if they have qualified professionals for this task in-house and can provide<br />

examples of how this has worked in other locations in which they are operating. However, the same<br />

standards of safety and environmental standards would be expected.<br />

Options to Sub-lease<br />

The Developer would have the flexibility to sub-lease the different components of this recreation zone<br />

to different developers, however the Developer will continue to remain responsible for the overall<br />

operations and maintenance and may recover charges for this from his sub-lessees. However, the<br />

sub-lease and developing and operating agreements for components to be sub-leased would be<br />

subject to approval by the GoS through the <strong>Keenjhar</strong> <strong>Project</strong> Company.<br />

Standardized agreements and sub-lease documentation are required to be developed and their<br />

contents agreed with <strong>Keenjhar</strong> <strong>Project</strong> Company in advance. The purpose of this is to ensure that the<br />

principle elements of the sub-lease and development agreements are approved and subsequent<br />

variations that are subject to negotiations with parties are kept to a bare minimum.<br />

57<br />

<strong>Keenjhar</strong> <strong>Lake</strong> <strong>Resort</strong> <strong>Project</strong> - <strong>Project</strong> Information Memorandum

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!