Metropolitan Coal Project Independent ... - Peabody Energy
Metropolitan Coal Project Independent ... - Peabody Energy
Metropolitan Coal Project Independent ... - Peabody Energy
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
METROPOLITAN COAL PROJECT INDEPENDENT ENVIRONMENTAL AUDIT<br />
The <strong>Metropolitan</strong> <strong>Coal</strong> Water Savings Action Plan (WSAP) has resulted in significant reductions in<br />
potable water consumption sourced from the Sydney Water supply. Commitments to continually<br />
building on the WSAP initiatives involve increasing the efficiency of overall water use for the<br />
<strong>Metropolitan</strong> <strong>Coal</strong> operations and minimisation of the potable water consumption and off-site water<br />
releases.<br />
4.16.3 Discharges to Camp Creek<br />
The site water management system continuously monitors turbidity and prevents discharges of water<br />
to Camp Creek that exceed the EPL 767 criteria. Water that exceeds the criteria is further treated to<br />
ensure that water discharged complies with the EPL criteria.<br />
Monitoring results during the 2010-2011 were compliant with the regulatory requirements, with the<br />
exception of the TSS measurement for January and pH level for August 2010.<br />
Table 7: Summary of Discharge Water Quality 2010 and 2011<br />
pH TSS mg/l Oil and Grease mg/l<br />
1 August 2009 to 31 July 2010 8.2 to 8.5