13.11.2014 Views

Metropolitan Coal Project Independent ... - Peabody Energy

Metropolitan Coal Project Independent ... - Peabody Energy

Metropolitan Coal Project Independent ... - Peabody Energy

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

METROPOLITAN COAL PROJECT INDEPENDENT ENVIRONMENTAL AUDIT<br />

The <strong>Metropolitan</strong> <strong>Coal</strong> Water Savings Action Plan (WSAP) has resulted in significant reductions in<br />

potable water consumption sourced from the Sydney Water supply. Commitments to continually<br />

building on the WSAP initiatives involve increasing the efficiency of overall water use for the<br />

<strong>Metropolitan</strong> <strong>Coal</strong> operations and minimisation of the potable water consumption and off-site water<br />

releases.<br />

4.16.3 Discharges to Camp Creek<br />

The site water management system continuously monitors turbidity and prevents discharges of water<br />

to Camp Creek that exceed the EPL 767 criteria. Water that exceeds the criteria is further treated to<br />

ensure that water discharged complies with the EPL criteria.<br />

Monitoring results during the 2010-2011 were compliant with the regulatory requirements, with the<br />

exception of the TSS measurement for January and pH level for August 2010.<br />

Table 7: Summary of Discharge Water Quality 2010 and 2011<br />

pH TSS mg/l Oil and Grease mg/l<br />

1 August 2009 to 31 July 2010 8.2 to 8.5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!