Attachment A - <strong>Project</strong> Approval 08-0149, 22 June 2009; and<br />
Condition<br />
No.<br />
Notice of Modification 8 September 2010 and 2 July 2011<br />
SCHEDULE 2 ADMINISTRATIVE CONDITONS<br />
<strong>Metropolitan</strong> <strong>Coal</strong> <strong>Independent</strong> Environmental Audit<br />
Condition Verification Compliance Comments<br />
OBLIGATION TO MINIMISE HARM TO THE ENVIRONMENT<br />
2/1 The Proponent shall implement all reasonable and feasible measures<br />
to prevent and/or minimise any harm to the environment that may<br />
result from the construction, operation, or rehabilitation of the project<br />
TERMS OF APPROVAL<br />
2/2 The Proponent shall carry out the project generally in accordance with<br />
the:<br />
(a) EA;<br />
(b)<br />
(c)<br />
PPR;<br />
EA-MOD1 Environmental Assessment titled <strong>Metropolitan</strong><br />
Mine Replacement Drift Construction Modification<br />
Environmental Assessment, dated July 2010; and<br />
(d) conditions of this approval.<br />
Note: The general layout of the project is shown in Appendices 2 to 4.<br />
2/3 If there is any inconsistency between the above documents, the most<br />
recent document shall prevail to the extent of the inconsistency.<br />
However, the conditions of this approval shall prevail to the extent of<br />
any inconsistency.<br />
The Proponent shall comply with any reasonable requirement/s of the<br />
Director-General arising from the Department’s assessment of:<br />
(a) any strategies, plans, programs, reviews, audits, or<br />
correspondence that are submitted in accordance with this<br />
approval; and<br />
(b) the implementation of any actions or measures contained in<br />
these documents.<br />
LIMITS ON APPROVAL<br />
2/5 The Proponent may undertake mining operations in the mining area<br />
for up to 23 years from the date of this approval.<br />
Note: Under this approval, the Proponent is required to rehabilitate the<br />
site and perform additional undertakings to the satisfaction of the<br />
Director-General. Consequently, this approval will continue to apply in<br />
all other respects other than the right to conduct mining operations<br />
until the site has been properly rehabilitated.<br />
<strong>Project</strong> Approval 22 June<br />
2009<br />
Noted<br />
C<br />
Noted<br />
Noted<br />
Noted<br />
The <strong>Metropolitan</strong> Mine has been developed<br />
generally in accordance with the Environmental<br />
Assessment, Preferred <strong>Project</strong> Report and<br />
Modification 1.<br />
No inconsistency with the <strong>Metropolitan</strong> Colliery<br />
development and the Environmental Assessment<br />
and Modification 1.<br />
The mining operations under this <strong>Project</strong> Approval<br />
can occur until 2032.<br />
i<br />
| <strong>Metropolitan</strong> <strong>Coal</strong> <strong>Project</strong> Approval, Environment Protection License and Consolidated Mining Lease