<strong>Metropolitan</strong> <strong>Coal</strong> <strong>Independent</strong> Environmental Audit<br />

Condition<br />

No.<br />

OFFSETS<br />

Catchment Improvement Works<br />

6/5 The Proponent shall:<br />

(a) pay SCA $100,000 by the end of 2011 to carry out<br />

catchment improvement works within the Woronora<br />

catchment area; or<br />

(b) carry out catchment improvement works within this area that<br />

have an equivalent value to the satisfaction of SCA.<br />

Offsets<br />

6/6 If the Proponent exceeds the performance measures in Table 1 of this<br />

approval, and either<br />

(a) the contingency measures implemented by the Proponent<br />

have failed to remediate the impact; or<br />

(b) the Director-General determines that it is not reasonable or<br />

feasible to remediate the impact, then the Proponent shall<br />

provide a suitable offset to compensate for the impact to the<br />

satisfaction of the Director-General.<br />

Note: Any offsets required under this condition must be proportionate<br />

with the significance of the impact.<br />

Condition Verification Compliance Comments<br />

SCHEDULE 7 ENVIRONMENTAL MANAGEMENT, REPORTING AND AUDITING<br />

ENVIRONMENTAL MANAGEMENT<br />

Environmental Management Strategy<br />

7/1 The Proponent shall prepare and implement an Environmental<br />

Management Strategy for the project to the satisfaction of the Director-<br />

General. The strategy must:<br />

(a) be submitted to the Director-General for approval by the end<br />

of September 2009;<br />

(b) provide the strategic framework for environmental<br />

management of the project;<br />

(c)<br />

(d)<br />

(e)<br />

<br />

<br />

<br />

identify the statutory approvals that apply to the project;<br />

describe the role, responsibility, authority and accountability<br />

of all key personnel involved in the environmental<br />

management of the project;<br />

describe the procedures that would be implemented to:<br />

keep the local community and relevant agencies informed<br />

about the operation and environmental performance of the<br />

project;<br />

receive, handle, respond to, and record complaints;<br />

resolve any disputes that may arise during the course of the<br />

project;<br />

<strong>Metropolitan</strong> Colliery<br />

Environmental Management<br />

Strategy, Mar 2011<br />

Letter from DP&I re Approval<br />

of EMS, 14 Nov 2011<br />

C<br />

In progress<br />

Not activated<br />

C<br />

<strong>Metropolitan</strong> <strong>Coal</strong> has consulted with SCA and<br />

propose to carry out two projects (rehabilitation of a<br />

walking track and a quarry site within the SCA area)<br />

plus a weed control program, following agreement<br />

with SCA. The consultation with SCA in relation to<br />

these projects is planned to occur in December<br />

2011.<br />

The Environmental Management Strategy has been<br />

prepared and the strategy implemented for the<br />

<strong>Metropolitan</strong> <strong>Coal</strong> operations:<br />

(a) Environmental Management Strategy was<br />

prepared and submitted to the D-G in<br />

September 2009.<br />

(b) The Environmental Management Strategy<br />

provides the strategic framework for<br />

environmental management of the <strong>Metropolitan</strong><br />

Colliery operations.<br />

(c) Section 3 Statutory<br />

(d) Section 5 Environmental Management<br />

Responsibility, Personnel and Roles<br />

(e) Procedures for implementation of the<br />

Environmental Management Strategy:<br />

<br />

<br />

Section 6.1 Information Dissemination<br />

Section 6.2 Complaints and Response<br />

Procedures<br />

xxvii<br />