<strong>Metropolitan</strong> <strong>Coal</strong> <strong>Independent</strong> Environmental Audit<br />

Condition<br />

No.<br />

METEOROLOGICAL<br />

4/16 During the life of the project, the Proponent shall ensure that there is a<br />

suitable meteorological station in the vicinity of the surface facilities<br />

area that complies with the requirements in the Approved Methods for<br />

Sampling of Air Pollutants in New South Wales guideline.<br />

TRANSPORT<br />

Parkes Street Intersection<br />

4/17 By the end of 2010, the Proponent shall:<br />

(a) undertake a road safety audit of the Parkes Street and<br />

Condition Verification Compliance Comments<br />

Siting Report Automatic<br />

Weather Station, Novecom,<br />

30 May 2011<br />

Emails between the<br />

<strong>Metropolitan</strong> Colliery, RTA,<br />

C<br />

C<br />

In progress<br />

meteorological station at Robertson Street in<br />

Helensburgh. The rainfall data is used as an<br />

input to the surface facilities water balance<br />

model.”<br />

Surface Facilities Water Management Plan, S6,<br />

p19<br />

Note: The Surface Facilities Water Management<br />

Plan (S7.4, p21) states that “The mine water make<br />

water balance has been suitably integrated with the<br />

<strong>Metropolitan</strong> Mine Catchment Monitoring Program<br />

and the <strong>Metropolitan</strong> Mine Long-walls 20-22 Water<br />

Management Plan”. Both the Construction<br />

Management Plan (S5.4.4. p71) and Water<br />

Management Plan (S7.6, p76) include details of the<br />

monitoring program to assess mine water make that<br />

reflect the monitoring specified in the Surface<br />

Facilities Water Management Plan.<br />

The location of the automatic weather station<br />

installed at the <strong>Metropolitan</strong> Colliery at Robertson<br />

Street Helensburgh was assessed by Novecom in<br />

May 2011 and considered representative of the<br />

receiving environment. The weather station includes<br />

wind speed and direction, temperature, (2m and<br />

10m), relative humidity and rainfall.<br />

The main automatic meteorological station is<br />

supplemented with additional weather monitoring<br />

locations:<br />

SentineX 90 Module Type Description<br />

M1<br />

M2<br />

D1<br />

D2<br />

J1<br />

J2<br />

J3<br />

Primary meteorological monitoring system<br />

Stockpile wind monitoring system<br />

TEOM ambient particulate monitoring<br />

system<br />

Portable dust monitoring system<br />

Stockpile level monitoring system<br />

Camps Creek discharge<br />

Camps Creek extraction<br />

Stage 5 Road Safety Audit & Recommendations<br />

Report - Parkes Street & Colliery Road Intersection,<br />

xix<br />

| <strong>Metropolitan</strong> <strong>Coal</strong> <strong>Project</strong> Approval, Environment Protection License and Consolidated Mining Lease