<strong>Metropolitan</strong> <strong>Coal</strong> <strong>Independent</strong> Environmental Audit<br />
Condition<br />
No.<br />
METEOROLOGICAL<br />
4/16 During the life of the project, the Proponent shall ensure that there is a<br />
suitable meteorological station in the vicinity of the surface facilities<br />
area that complies with the requirements in the Approved Methods for<br />
Sampling of Air Pollutants in New South Wales guideline.<br />
TRANSPORT<br />
Parkes Street Intersection<br />
4/17 By the end of 2010, the Proponent shall:<br />
(a) undertake a road safety audit of the Parkes Street and<br />
Condition Verification Compliance Comments<br />
Siting Report Automatic<br />
Weather Station, Novecom,<br />
30 May 2011<br />
Emails between the<br />
<strong>Metropolitan</strong> Colliery, RTA,<br />
C<br />
C<br />
In progress<br />
meteorological station at Robertson Street in<br />
Helensburgh. The rainfall data is used as an<br />
input to the surface facilities water balance<br />
model.”<br />
Surface Facilities Water Management Plan, S6,<br />
p19<br />
Note: The Surface Facilities Water Management<br />
Plan (S7.4, p21) states that “The mine water make<br />
water balance has been suitably integrated with the<br />
<strong>Metropolitan</strong> Mine Catchment Monitoring Program<br />
and the <strong>Metropolitan</strong> Mine Long-walls 20-22 Water<br />
Management Plan”. Both the Construction<br />
Management Plan (S5.4.4. p71) and Water<br />
Management Plan (S7.6, p76) include details of the<br />
monitoring program to assess mine water make that<br />
reflect the monitoring specified in the Surface<br />
Facilities Water Management Plan.<br />
The location of the automatic weather station<br />
installed at the <strong>Metropolitan</strong> Colliery at Robertson<br />
Street Helensburgh was assessed by Novecom in<br />
May 2011 and considered representative of the<br />
receiving environment. The weather station includes<br />
wind speed and direction, temperature, (2m and<br />
10m), relative humidity and rainfall.<br />
The main automatic meteorological station is<br />
supplemented with additional weather monitoring<br />
locations:<br />
SentineX 90 Module Type Description<br />
M1<br />
M2<br />
D1<br />
D2<br />
J1<br />
J2<br />
J3<br />
Primary meteorological monitoring system<br />
Stockpile wind monitoring system<br />
TEOM ambient particulate monitoring<br />
system<br />
Portable dust monitoring system<br />
Stockpile level monitoring system<br />
Camps Creek discharge<br />
Camps Creek extraction<br />
Stage 5 Road Safety Audit & Recommendations<br />
Report - Parkes Street & Colliery Road Intersection,<br />
xix<br />
| <strong>Metropolitan</strong> <strong>Coal</strong> <strong>Project</strong> Approval, Environment Protection License and Consolidated Mining Lease