<strong>Metropolitan</strong> <strong>Coal</strong> <strong>Independent</strong> Environmental Audit<br />

Attachment C Mining Lease<br />

INSTRUMENT OF RENEWAL<br />

Lease No. Consolidated <strong>Coal</strong> Lease (CCL) No. 703 (ACT, 1973)<br />

Holder: <strong>Metropolitan</strong> Collieries Limited (ABN. 91 003 135 635)<br />

Date of Lease 3 July 1989 Expiry Date of the Lease: 26 January 2003<br />

Period of Renewal: 26 January 2024<br />

Area:<br />

about 51.95 square kilometres<br />

Mineral:<br />

<strong>Coal</strong><br />

Amendments to the Conditions of the Lease: All the Conditions contained in the lease prior to the renewal have been deleted.<br />

The lease is now subject to the attached Schedule of Conditions of Authority (<strong>Coal</strong>) (1999) related to environmental management<br />

ML No. ML Condition Compliance Comment<br />

SCHEDULE OF CONDITIONS OF AUTHORITY (COAL) (1999) EXTRACTION OF COAL<br />

1 The lease holder shall extract as large a percentage of the coal<br />

in the subject area as is practicable consistent with the<br />

provisions of the <strong>Coal</strong> Mines Regulations Act 1982 and the<br />

Regulations thereunder and shall comply with any direction<br />

given or which may be given in this regard by the Minister.<br />

MINING, REHABILITATION, ENVIRONMENTAL MANAGEMENT PROCESS (MREMP) MINING OPERATIONS PLAN (MOP)<br />

2 (1) Mining operations, including mining purposes, must be<br />

conducted in accordance with a Mining Operations Plan<br />

(the Plan) satisfactory to the Director-General. The Plan<br />

together with environmental conditions of development<br />

consent and other approvals will form the basis for:-<br />

ongoing mining operations and environmental<br />

management; and<br />

ongoing monitoring of the project.<br />

(2) The Plan must be prepared in accordance with the<br />

Director-General's guidelines, current at the time of<br />

lodgement.<br />

(3) A Plan must be lodged with the Director-General :<br />

<br />

<br />

<br />

prior to the commencement of operations;<br />

subsequently as appropriate prior to the expiry of any<br />

current Plan; and<br />

in accordance with any direction issued by the<br />

Director-General.<br />

(4) The Plan must present a schedule of proposed mine<br />

development for a period of up to seven (7) years and<br />

contain diagrams and documentation which identify:-<br />

Mining Operations Plan, 2000<br />

Mining Operations Plan 1 Oct 2005<br />

to 30 Sep 2012, dated 31 Aug 2005<br />

Letter from DPI re Approval of MOP<br />

1 Oct 2005 to 30 Sep 2012, 14 Sep<br />

2005<br />

Draft Final Closure Plan, Oct 2005<br />

Letter from DPI re Draft Final<br />

Closure Plan – Addendum to MOP,<br />

24 Oct 2005<br />

Letter from DI&I re Approval of MOP<br />

Amendment, 20 May 2010<br />

Noted<br />

C (1) The current Mining Operations Plan 2005 to 2012<br />

was approved by DPI Minerals and amendment of<br />

the MOP occurred in 2010 and was approved by<br />

DI&I. Environmental management of the mine<br />

operations occurs in accordance with the MOP,<br />

<strong>Project</strong> Approval conditions and Environment<br />

Protection Licence conditions and monitoring<br />

programs.<br />

(2) The MOP was prepared by Olsen Environmental<br />

Consulting to satisfy the Director-General’s<br />

Guidelines current in 2005.<br />

(3) The MOP was lodged with the D-G prior to expiry<br />

of the previous MOP 2000 to address the<br />

proposed operations of the <strong>Metropolitan</strong> Colliery<br />

operations for the 1 October to 30 September<br />

2012 period.<br />

(4) Section 3 of the MOP presented Proposed Mining<br />

Activities for the 2005 to 2012 period:<br />

plans of areas proposed to be disturbed during the<br />

period of the MOP (Plans 4A, 4B and 4C);<br />

Section 4 Proposed Rehabilitation Activities during<br />

xliii<br />

| <strong>Metropolitan</strong> <strong>Coal</strong> <strong>Project</strong> Approval, Environment Protection License and Consolidated Mining Lease