<strong>Metropolitan</strong> <strong>Coal</strong> <strong>Independent</strong> Environmental Audit<br />
Condition<br />
No.<br />
<br />
Condition Verification Compliance Comments<br />
measurement of noise from the project is impractical, alternative<br />
means of determining compliance (see Chapter 11 of the NSW<br />
Industrial Noise Policy may be accepted.<br />
The noise emission limits identified in the above table apply under<br />
meteorological conditions of:<br />
o wind speeds of up to 3 m/s at 10 metres above ground<br />
level; or<br />
o temperature inversion conditions of up to 3ºC/100m, and<br />
wind speeds of up to 2 m/s at 10 metres above ground<br />
level, determined in accordance with the NSW Industrial<br />
Noise Policy.<br />
Noise Acquisition Criteria<br />
4/2 If after 2014, the noise generated by the project exceeds the criteria in<br />
Table 3 at any residence on privately-owned land, or on more than<br />
25% of any privately-owned land, then the Proponent shall, upon<br />
receiving a written request for acquisition from the landowner, acquire<br />
the land in accordance with the procedures in conditions 5-7 of<br />
schedule 5.<br />
Table 3: Noise Acquisition Criteria<br />
Day<br />
LAeq(15 min)<br />
Evening<br />
LAeq(15 min)<br />
Night<br />
LAeq(15 min)<br />
55 dB(A) 50 DB(A) 50 DB(A)<br />
Note: Noise generated by the project is to be measured in accordance<br />
with the notes presented below Table 2. For this condition to apply,<br />
the exceedances of the criteria must be systemic.<br />
Additional Noise Mitigation Measures<br />
4/3 If after 2014, the noise generated by the project exceeds the criteria in<br />
Table 4 at any residence on privately-owned land, then the Proponent<br />
shall, upon receiving a written request from the landowner, implement<br />
reasonable and feasible noise mitigation measures (such as doubleglazing,<br />
insulation, and/or air conditioning) at the residence in<br />
consultation with the land owner. If within 3 months of receiving this<br />
request from the landowner, the Proponent and the landowner cannot<br />
agree on the measures to be implemented, or there is a dispute about<br />
the implementation of these measures, then either party may refer the<br />
matter to the Director-General for resolution.<br />
Table 4: Additional Noise Mitigation Criteria<br />
Day LAeq(15 min)<br />
Evening LAeq(15<br />
min)<br />
Night LAeq(15<br />
min)<br />
53 dB(A) 48 dB(A) 48 dB(A)<br />
Not activated<br />
Not activated<br />
This condition is to be activated after the end of<br />
2014.<br />
This condition may be activated after the end of<br />
2014.<br />
xiii<br />
| <strong>Metropolitan</strong> <strong>Coal</strong> <strong>Project</strong> Approval, Environment Protection License and Consolidated Mining Lease