<strong>Metropolitan</strong> <strong>Coal</strong> <strong>Independent</strong> Environmental Audit<br />

Condition<br />

No.<br />

Condition Verification Compliance Comments<br />

Colliery Road intersection, in consultation with the RTA and<br />

WCC; and<br />

(b) implement any recommendations of this audit,<br />

to the satisfaction of the Director-General.<br />

Road Maintenance Contributions<br />

4/18 From the end of 2009, the Proponent shall make a suitable annual<br />

contribution to WCC, WSC, and CC for the maintenance of local roads<br />

that are used as haulage routes by the project. If there is any dispute<br />

over the amount of the contribution, the matter must be referred to the<br />

Director-General for resolution.<br />

Road Transport Restrictions<br />

4/19 The Proponent shall not:<br />

(a) load coal or coal reject onto trucks, or transport it off site by<br />

road, outside the hours of 7am and 6pm Monday to Friday;<br />

(b) transport more than 170,000 tonnes of coal off site by road<br />

in a calendar year;<br />

(c) transport any coal off site to the Port Kembla <strong>Coal</strong> Terminal<br />

by road.<br />

(d) permit the departure of more than 25 trucks containing<br />

product coal for delivery to the Corrimal Coke works on any<br />

given day; or<br />

(e) permit the departure of more than 30 trucks containing<br />

product coal for delivery to the <strong>Coal</strong>cliff Coke works on any<br />

given day.<br />

Traffic Committee, and<br />

Consulting Civil Infrastructure<br />

Engineers (J Wyndham<br />

Prince),<br />

Stage 5 Road Safety Audit &<br />

Recommendations Report -<br />

Parkes Street & Colliery<br />

Road Intersection,<br />

Helensburgh, J Wyndham<br />

Prince, Sep 2010<br />

Regulatory Requirement<br />

Council Contributions, 7 Oct<br />

2011<br />

Wollongong City Council Tax<br />

Invoice 8 Sep 2011<br />

Wollondilly Shire Council Tax<br />

Invoice No. 14288, 5 Sep<br />

2011<br />

Campbelltown City Council<br />

Tax Invoice No. 43408, 4 Oct<br />

2011<br />

<strong>Metropolitan</strong> Colliery Traffic<br />

Management Plan<br />

Letter to DP&I re <strong>Project</strong><br />

Approval Modification , 9<br />

March 2011<br />

Letter from DP&I re Approval<br />

Traffic Management Plan, 14<br />

Apr 2011<br />

Helensburgh, was prepared for <strong>Peabody</strong> <strong>Energy</strong> by J<br />

Wyndham Prince, in September 2010.<br />

A Draft Plan for the Parkes Street intersection has<br />

been approved and discussions are ongoing with the<br />

Council, RTA and Traffic Committees in relation to<br />

progressing with the construction of the approved<br />

plan.<br />

C Contributions have been paid to the WCC ($55,000)<br />

on Invoice 404487601980163 dated 8 September<br />

2011.<br />

Contribution to Wollondilly Shire Council ($27,500)<br />

for road maintenance paid on Invoice No. 14288<br />

dated 5 September 2011.<br />

Contribution to Campbelltown City Council ($27,500)<br />

for road maintenance paid on Tax Invoice No. 43408<br />

on 5 Oct 2011.<br />

C<br />

Modification to<br />

<strong>Project</strong><br />

Approval In<br />

progress<br />

(a)<br />

(b)<br />

(c)<br />

(d)<br />

(e)<br />

<strong>Coal</strong> and reject transport off site occur from the<br />

<strong>Metropolitan</strong> <strong>Coal</strong> site occurs between 7.00am<br />

and 6.00pm Monday to Friday only.<br />

a Modification submitted to DoP on 9 March<br />

2011 with respect to coal and coal reject<br />

trucking requested condition 19 to be modified<br />

to provide for the number of trucks per day<br />

transporting coal and coal reject to .<strong>Coal</strong><br />

transported offsite did not exceed the 170,000<br />

tonnes per annum equivalent between July 2011<br />

and December 2011.<br />

All coal transport to Port Kembla occurs by rail.<br />

Truck movements to Corrimal Coke Works have<br />

been less than 25 trucks/day (ranging from 93<br />

truck movements during October 2011 to a<br />

maximum of 192 in April 2012);<br />

Truck movements to <strong>Coal</strong>cliffl Coke Works have<br />

been less than 30 trucks/day (ranging from 67<br />

truck movements during December 2011 to a<br />

maximum of 175 during April 2012).<br />

xx<br />