<strong>Metropolitan</strong> <strong>Coal</strong> <strong>Independent</strong> Environmental Audit<br />

Condition<br />

No.<br />

Condition Verification Compliance Comments<br />

Note: Noise generated by the project is to be measured in accordance<br />

with the notes presented below Table 2.<br />

Rail Noise<br />

4/4 The Proponent shall only use locomotives that are approved to<br />

operate on the NSW rail network in accordance with noise limits L6.1<br />

to L6.4 in Rail Corp’s EPL (No. 12208) and ARTC’s EPL (No. 3142) or<br />

a Pollution Control Approval issued under the former Pollution Control<br />

Act 1970.<br />

4/5 The Proponent shall use its best endeavours to minimise night-time<br />

movements of rolling stock on the <strong>Metropolitan</strong> rail spur.<br />

4/6 In the event of any rail noise or vibration issues that may arise from<br />

the haulage of coal over the life of the <strong>Project</strong>, the Proponent shall<br />

liaise with the CCC and the rail service provider to facilitate resolution<br />

of these issues and implement additional noise reduction measures<br />

where appropriate.<br />

Blasting<br />

4/7 The Proponent shall not undertake blasting operations at the surface<br />

facilities area without the written approval of the D-G.<br />

Noise Management Plan<br />

4/8 The Proponent shall prepare and implement a Noise Management<br />

Plan for the project to the satisfaction of the Director-General. This<br />

plan must be prepared in consultation with DECC by a suitably<br />

qualified expert whose appointment has been approved by the<br />

Director-General, and submitted to the Director-General for approval<br />

by the end of June 2010. It must also provide for real-time noise<br />

monitoring.<br />

Memo from Freight Corp re<br />

82 and 90 Class Locomotive<br />

Noise Tests, 28 Feb 2000<br />

Letter from EPA re Approval<br />

of Works on 82 Class and 90<br />

Class Locomotives, 22 Feb<br />

2000<br />

Emails to Pacific National re<br />

Locomotives, Apr 2011<br />

Meeting Minutes with Pacific<br />

National re Rail Noise, 29<br />

Sep 2011<br />

Emails to Pacific National re<br />

Locomotives, 29 Jan to 16<br />

Feb 2012<br />

Noise Management Plan, 26<br />

Aug 2010<br />

Letter to DoP re Noise<br />

Management Plan, 23 Jun<br />

2010<br />

Letter from DoP re Approval<br />

of Revised Noise<br />

Management Plan, 14 Apr<br />

2011<br />

C<br />

Clyde Engineering undertook noise mitigation works<br />

on the 82 and 90 Class locomotives in February<br />

2000 and the works were approved by the EPA as<br />

satisfying condition 9 of the SRA Pollution Control<br />

Approvals No. 000993 and 000994.<br />

C Pacific National Meeting Minutes on 29<br />

September 2010 stated that “efforts to minimise<br />

noise impacts on the community, and reaffirmed<br />

of Schedule 4 condition 5 of <strong>Metropolitan</strong> <strong>Coal</strong>'s<br />

<strong>Project</strong> Approval which states that the colliery<br />

must use its best endeavours to minimise night<br />

time movements of rolling stock on the<br />

<strong>Metropolitan</strong> rail spur. All agreed to continue to<br />

work together to support compliance with the<br />

condition”.<br />

C<br />

Ongoing<br />

C<br />

C<br />

Noted<br />

No surface blasting has occurred at the <strong>Metropolitan</strong><br />

Colliery Mine.<br />

The Noise Management Plan was prepared in<br />

consultation with the DECCW and submitted to the<br />

Director-General for approval on the 23 June 2010.<br />

Noise Management Plan Section 7.1.1 addresses<br />

Real Time Continuous Monitoring and Location of<br />

the real time noise monitor.<br />

xiv<br />

| <strong>Metropolitan</strong> <strong>Coal</strong> <strong>Project</strong> Approval, Environment Protection License and Consolidated Mining Lease