<strong>Metropolitan</strong> <strong>Coal</strong> <strong>Independent</strong> Environmental Audit<br />
Condition<br />
No.<br />
Condition Verification Compliance Comments<br />
- validate the subsidence predictions; and<br />
- analyse the relationship between the subsidence effects<br />
and subsidence impacts of the Extraction Plan and any<br />
ensuing environmental consequences;<br />
(f) include a:<br />
Water Management Plan, which has been prepared in<br />
consultation with DECC, SCA and DWE, to manage the<br />
environmental consequences of the Extraction Plan on<br />
watercourses (including the Woronora Reservoir), aquifers<br />
and catchment yield;<br />
Biodiversity Management Plan, which has been prepared in<br />
consultation with DECC and DPI (Fisheries), to manage the<br />
potential environmental consequences of the Extraction<br />
Plan on aquatic and terrestrial flora and fauna, with a<br />
specific focus on swamps;<br />
Land Management Plan, which has been prepared in<br />
consultation with SCA, to manage the potential<br />
environmental consequences of the Extraction Plan on<br />
cliffs, overhangs, steep slopes and land in general;<br />
Heritage Management Plan, which has been prepared in<br />
consultation with DECC and the relevant Aboriginal groups,<br />
to manage the potential environmental consequences of the<br />
Extraction Plan on heritage sites or values;<br />
Built Features Management Plan, which has been prepared<br />
in consultation with the owner of the relevant feature , to<br />
manage the potential environmental consequences of the<br />
Extraction Plan on any built features; and<br />
(g) include a Public Safety Management Plan, which has been<br />
prepared in consultation with DPI and the DSC (for any mining<br />
within the DSC notification area), to ensure public safety in the<br />
mining area.<br />
3/7 In addition to the standard requirements for management plans (see<br />
condition 2 of schedule 7), the Proponent shall ensure that the<br />
management plans required under condition 6(f) above include:<br />
(a) a program to collect sufficient baseline data for future<br />
Extraction Plans;<br />
(b) a revised assessment of the potential environmental<br />
consequences of the Extraction Plan, incorporating any<br />
relevant information that has been obtained since this<br />
approval;<br />
(c) a detailed description of the measures that would be<br />
implemented to remediate predicted impacts; and<br />
(d) a contingency plan that expressly provides for adaptive<br />
management.<br />
Land Management Plan<br />
Heritage Management Plan<br />
Built Features Management<br />
Plan(s)<br />
Letter from DP&I re Approval<br />
of Water Management Plan<br />
Rev C, 14 Nov 2011<br />
Public Safety Management<br />
Plan<br />
Water Management Plan Rev<br />
C<br />
Land Management Plan<br />
Biodiversity Management<br />
Plan<br />
Extraction Plan Long-walls<br />
20-22<br />
C<br />
C<br />
C<br />
C<br />
C<br />
C<br />
(e) Other plans approved by DPI (DII)<br />
<strong>Coal</strong> Resource Recovery Plan<br />
Subsidence Monitoring Program<br />
(f) plus:<br />
Water Management Plan<br />
Biodiversity Management Plan<br />
Land Management Plan<br />
Heritage Management Plan<br />
Built Features Management Plan(s) for<br />
Transgrid, Integral <strong>Energy</strong>, Nextgen, Optus,<br />
Railcorp, RTA, Sydney Water, Telstra and WCC<br />
Water Management Plan Rev C approved on 14<br />
Nov 2011<br />
The document Revision Status Register notes<br />
that rev WMP-R01-A was distributed to the SCA,<br />
DECCW and DP&I. Subsequent revisions<br />
WMP-R01-B addressed comments by the SCA;<br />
WMP-R01-C addressed comments by the SCA<br />
and NOW and review/revision following<br />
submission of 2010 Annual Review.<br />
(g) Public Safety Management Plan prepared in<br />
consultation with DPI and the DSC<br />
(a)<br />
(b)<br />
(c)<br />
Water Management Plan / Land Management<br />
Plan/ and Biodiversity Management Plan have<br />
section 11 Future Extraction Plans; Heritage<br />
Management Plan section 13 Future Extraction<br />
Plans<br />
Water Management Plan Rev C, Section 4 and<br />
Land Management Plan/ and Biodiversity<br />
Management Plan have section 12 Annual<br />
Review and Improvement of Performance;<br />
Water Management Plan / Land Management<br />
Plan/ and Biodiversity Management Plan have<br />
section 8 Annual Review and Improvement of<br />
Performance;<br />
x<br />
| <strong>Metropolitan</strong> <strong>Coal</strong> <strong>Project</strong> Approval, Environment Protection License and Consolidated Mining Lease