<strong>Metropolitan</strong> <strong>Coal</strong> <strong>Independent</strong> Environmental Audit<br />

Condition<br />

No.<br />

Condition Verification Compliance Comments<br />

- validate the subsidence predictions; and<br />

- analyse the relationship between the subsidence effects<br />

and subsidence impacts of the Extraction Plan and any<br />

ensuing environmental consequences;<br />

(f) include a:<br />

Water Management Plan, which has been prepared in<br />

consultation with DECC, SCA and DWE, to manage the<br />

environmental consequences of the Extraction Plan on<br />

watercourses (including the Woronora Reservoir), aquifers<br />

and catchment yield;<br />

Biodiversity Management Plan, which has been prepared in<br />

consultation with DECC and DPI (Fisheries), to manage the<br />

potential environmental consequences of the Extraction<br />

Plan on aquatic and terrestrial flora and fauna, with a<br />

specific focus on swamps;<br />

Land Management Plan, which has been prepared in<br />

consultation with SCA, to manage the potential<br />

environmental consequences of the Extraction Plan on<br />

cliffs, overhangs, steep slopes and land in general;<br />

Heritage Management Plan, which has been prepared in<br />

consultation with DECC and the relevant Aboriginal groups,<br />

to manage the potential environmental consequences of the<br />

Extraction Plan on heritage sites or values;<br />

Built Features Management Plan, which has been prepared<br />

in consultation with the owner of the relevant feature , to<br />

manage the potential environmental consequences of the<br />

Extraction Plan on any built features; and<br />

(g) include a Public Safety Management Plan, which has been<br />

prepared in consultation with DPI and the DSC (for any mining<br />

within the DSC notification area), to ensure public safety in the<br />

mining area.<br />

3/7 In addition to the standard requirements for management plans (see<br />

condition 2 of schedule 7), the Proponent shall ensure that the<br />

management plans required under condition 6(f) above include:<br />

(a) a program to collect sufficient baseline data for future<br />

Extraction Plans;<br />

(b) a revised assessment of the potential environmental<br />

consequences of the Extraction Plan, incorporating any<br />

relevant information that has been obtained since this<br />

approval;<br />

(c) a detailed description of the measures that would be<br />

implemented to remediate predicted impacts; and<br />

(d) a contingency plan that expressly provides for adaptive<br />

management.<br />

Land Management Plan<br />

Heritage Management Plan<br />

Built Features Management<br />

Plan(s)<br />

Letter from DP&I re Approval<br />

of Water Management Plan<br />

Rev C, 14 Nov 2011<br />

Public Safety Management<br />

Plan<br />

Water Management Plan Rev<br />

C<br />

Land Management Plan<br />

Biodiversity Management<br />

Plan<br />

Extraction Plan Long-walls<br />

20-22<br />

C<br />

C<br />

C<br />

C<br />

C<br />

C<br />

(e) Other plans approved by DPI (DII)<br />

<strong>Coal</strong> Resource Recovery Plan<br />

Subsidence Monitoring Program<br />

(f) plus:<br />

Water Management Plan<br />

Biodiversity Management Plan<br />

Land Management Plan<br />

Heritage Management Plan<br />

Built Features Management Plan(s) for<br />

Transgrid, Integral <strong>Energy</strong>, Nextgen, Optus,<br />

Railcorp, RTA, Sydney Water, Telstra and WCC<br />

Water Management Plan Rev C approved on 14<br />

Nov 2011<br />

The document Revision Status Register notes<br />

that rev WMP-R01-A was distributed to the SCA,<br />

DECCW and DP&I. Subsequent revisions<br />

WMP-R01-B addressed comments by the SCA;<br />

WMP-R01-C addressed comments by the SCA<br />

and NOW and review/revision following<br />

submission of 2010 Annual Review.<br />

(g) Public Safety Management Plan prepared in<br />

consultation with DPI and the DSC<br />

(a)<br />

(b)<br />

(c)<br />

Water Management Plan / Land Management<br />

Plan/ and Biodiversity Management Plan have<br />

section 11 Future Extraction Plans; Heritage<br />

Management Plan section 13 Future Extraction<br />

Plans<br />

Water Management Plan Rev C, Section 4 and<br />

Land Management Plan/ and Biodiversity<br />

Management Plan have section 12 Annual<br />

Review and Improvement of Performance;<br />

Water Management Plan / Land Management<br />

Plan/ and Biodiversity Management Plan have<br />

section 8 Annual Review and Improvement of<br />

Performance;<br />

x<br />

| <strong>Metropolitan</strong> <strong>Coal</strong> <strong>Project</strong> Approval, Environment Protection License and Consolidated Mining Lease

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!