<strong>Metropolitan</strong> <strong>Coal</strong> <strong>Independent</strong> Environmental Audit<br />

Condition<br />

No.<br />

Condition Verification Compliance Comments<br />

assessment, plan or program required under these approvals);<br />

(d) (d) review the adequacy of strategies, plans or programs<br />

required under these approvals; and, if appropriate; and<br />

(e) (e) recommend measures or actions to improve the environmental<br />

performance and/or any assessment, plan or program required under<br />

these approvals.<br />

7/9 Within 6 weeks of the completing of this audit, or as otherwise agreed<br />

by the Director-General, the Proponent shall submit a copy of the<br />

audit report to the Director-General, together with its response to any<br />

recommendations contained in the audit report.<br />

ACCESS TO INFORMATION<br />

7/10 From the end of 2009, the Proponent shall make the following<br />

information publicly available on its website:<br />

(a) a copy of all current statutory approvals;<br />

(b) a copy of the current environmental management strategy<br />

and associated plans and programs;<br />

(c) a summary of the monitoring results of the project, which<br />

have been reported in accordance with the various plans<br />

and programs approved under the conditions of this<br />

approval;<br />

(d) a complaints register, which is to be updated on a monthly<br />

basis;<br />

(e) a copy of the minutes of CCC meetings;<br />

(f) a copy of any Annual Reviews (over the last 5 years);<br />

(g) a copy of any <strong>Independent</strong> Environmental Audit, and the<br />

Proponent’s response to the recommendations in any audit;<br />

and<br />

(h) any other matter required by the Director-General.<br />

C<br />

C<br />

C<br />

C<br />

Noted<br />

C<br />

Ditton of DgS on 30 January 2012, following<br />

delays in gaining access to SCA area due to wet<br />

weather.<br />

Noise audit conducted by J Wasserman of<br />

Wilkinson Murray on 3 March 2012.<br />

(b) No specific requests for matters to be included in<br />

the audit were received from relevant agencies<br />

in response to email contact.<br />

(c) Environmental performance and compliance<br />

have been assessed by the audit team.<br />

(d) strategies, plans and programs required by the<br />

relevant approvals were assessed for adequacy.<br />

(e) suggestions and recommend measures or<br />

actions to improve environmental performance<br />

have been provided where relevant.<br />

All statutory approvals, relevant plans and programs<br />

listed under the <strong>Project</strong> Approval have been<br />

uploaded on the project website:<br />

http://www.peabodyenergy.com.au/nsw/metropolitanenvironment-community-information<br />

A summary of surface water monitoring is provided<br />

for both the mine area and surrounds and the<br />

surface facilities area. These summaries only<br />

include data from 2010.<br />

Complaints, CCC Minutes and Community<br />

Newsletters, have been uploaded for 2009 to 2011.<br />

The Annual Reviews, which include a summary of<br />

surface water monitoring, have been uploaded to the<br />

project website.<br />

xxxi<br />

| <strong>Metropolitan</strong> <strong>Coal</strong> <strong>Project</strong> Approval, Environment Protection License and Consolidated Mining Lease