<strong>Metropolitan</strong> <strong>Coal</strong> <strong>Independent</strong> Environmental Audit<br />
Condition<br />
No.<br />
Condition Verification Compliance Comments<br />
assessment, plan or program required under these approvals);<br />
(d) (d) review the adequacy of strategies, plans or programs<br />
required under these approvals; and, if appropriate; and<br />
(e) (e) recommend measures or actions to improve the environmental<br />
performance and/or any assessment, plan or program required under<br />
these approvals.<br />
7/9 Within 6 weeks of the completing of this audit, or as otherwise agreed<br />
by the Director-General, the Proponent shall submit a copy of the<br />
audit report to the Director-General, together with its response to any<br />
recommendations contained in the audit report.<br />
ACCESS TO INFORMATION<br />
7/10 From the end of 2009, the Proponent shall make the following<br />
information publicly available on its website:<br />
(a) a copy of all current statutory approvals;<br />
(b) a copy of the current environmental management strategy<br />
and associated plans and programs;<br />
(c) a summary of the monitoring results of the project, which<br />
have been reported in accordance with the various plans<br />
and programs approved under the conditions of this<br />
approval;<br />
(d) a complaints register, which is to be updated on a monthly<br />
basis;<br />
(e) a copy of the minutes of CCC meetings;<br />
(f) a copy of any Annual Reviews (over the last 5 years);<br />
(g) a copy of any <strong>Independent</strong> Environmental Audit, and the<br />
Proponent’s response to the recommendations in any audit;<br />
and<br />
(h) any other matter required by the Director-General.<br />
C<br />
C<br />
C<br />
C<br />
Noted<br />
C<br />
Ditton of DgS on 30 January 2012, following<br />
delays in gaining access to SCA area due to wet<br />
weather.<br />
Noise audit conducted by J Wasserman of<br />
Wilkinson Murray on 3 March 2012.<br />
(b) No specific requests for matters to be included in<br />
the audit were received from relevant agencies<br />
in response to email contact.<br />
(c) Environmental performance and compliance<br />
have been assessed by the audit team.<br />
(d) strategies, plans and programs required by the<br />
relevant approvals were assessed for adequacy.<br />
(e) suggestions and recommend measures or<br />
actions to improve environmental performance<br />
have been provided where relevant.<br />
All statutory approvals, relevant plans and programs<br />
listed under the <strong>Project</strong> Approval have been<br />
uploaded on the project website:<br />
http://www.peabodyenergy.com.au/nsw/metropolitanenvironment-community-information<br />
A summary of surface water monitoring is provided<br />
for both the mine area and surrounds and the<br />
surface facilities area. These summaries only<br />
include data from 2010.<br />
Complaints, CCC Minutes and Community<br />
Newsletters, have been uploaded for 2009 to 2011.<br />
The Annual Reviews, which include a summary of<br />
surface water monitoring, have been uploaded to the<br />
project website.<br />
xxxi<br />
| <strong>Metropolitan</strong> <strong>Coal</strong> <strong>Project</strong> Approval, Environment Protection License and Consolidated Mining Lease