<strong>Metropolitan</strong> <strong>Coal</strong> <strong>Independent</strong> Environmental Audit<br />
Condition<br />
No.<br />
2/6 The Proponent shall not:<br />
(a) extract more than 3.2 million tonnes of ROM coal from the<br />
mining area in a calendar year, or<br />
(b) transport more than 2.8 million tonnes of product coal from<br />
the site in a calendar year.<br />
2/7 The Proponent shall not export any coal reject from the site after 2021<br />
without the written approval of the D-G.<br />
2/8 The Proponent shall not emplace coal reject on the surface of the site<br />
without the written approval of the D-G.<br />
Note: This condition applies to the Camp Gully Emplacement Area, as<br />
well as to the rest of the surface of the site. It does not apply to the<br />
proposed additional coal reject stockpile shown in Appendix 4.<br />
STRUCTURAL ADEQUACY<br />
2/9 The Proponent shall ensure that all new buildings and structures, and<br />
any alterations or additions to existing buildings and structure, are<br />
constructed in accordance with:<br />
(a)<br />
(b)<br />
Notes:<br />
<br />
<br />
Condition Verification Compliance Comments<br />
the relevant requirements of the BCA; and<br />
any additional requirements of the MSB in areas where<br />
subsidence effects are likely to occur.<br />
Under Part 4A of the EP&A Act, the Proponent is required to<br />
obtain construction and occupation certificates for the proposed<br />
building works.<br />
Part 8 of the EP&A Regulation sets out the requirements for the<br />
certification of the project.<br />
DEMOLITION<br />
2/10 The Proponent shall ensure that all demolition work is carried out in<br />
accordance with Australian Standard AS 2601-2001: The Demolition<br />
of Structures, or its latest version.<br />
Letter from Planning re<br />
Surface Facilities Works at<br />
Mine Mangers Residence, 21<br />
Apr 2010<br />
Demolition Safety Plan<br />
<strong>Metropolitan</strong> Colliery Partial<br />
Demolition of the<br />
Maintenance and Bag House<br />
Sheds, 30 Aug 2010<br />
Inspection and Test Record<br />
Partial Demolition of Sheds,<br />
World Wide Demolitions Pty<br />
C (a) The ROM coal production from the<br />
<strong>Metropolitan</strong> <strong>Coal</strong> operations has complied<br />
with the condition.<br />
Production<br />
Period<br />
2011 2010 2009<br />
Noted<br />
C<br />
C<br />
C<br />
ROM coal<br />
(mtpa)<br />
Product <strong>Coal</strong><br />
(mtpa)<br />
(b)<br />
1,849,163 1,640,723<br />
1,534,585 1,375,208<br />
Product coal transported from the site has<br />
not exceeded 2.8mtpa.<br />
No coal reject emplacement occurs on the surface,<br />
at the <strong>Metropolitan</strong> Mine site.<br />
Renovations have been completed to the former<br />
Mine Manager’s residence at the Major Surface<br />
Facilities Area for use as <strong>Metropolitan</strong> <strong>Coal</strong><br />
administration offices. All works were conducted in<br />
accordance with Building Code of Australia<br />
requirements and fully landscaped cognisant of the<br />
residential surrounds.<br />
Planning considered that the works carried out to the<br />
Mine Manager’s residence were exempt<br />
development under the State Environmental<br />
Planning Policy (Mining, Petroleum Production and<br />
Extraction Industries) 2007.<br />
Partial demolition of the maintenance and bag house<br />
sheds occurred in 2010 in accordance with the<br />
Demolition Safety Plan. The demolition was<br />
undertaken by World Wide Demolitions Pty Ltd and<br />
Inspection and Test Records were completed by<br />
World Wide Demolitions.<br />
ii<br />
| <strong>Metropolitan</strong> <strong>Coal</strong> <strong>Project</strong> Approval, Environment Protection License and Consolidated Mining Lease