<strong>Metropolitan</strong> <strong>Coal</strong> <strong>Independent</strong> Environmental Audit<br />
Condition<br />
No.<br />
Condition Verification Compliance Comments<br />
of the Director-General. This strategy must:<br />
(a) be prepared by a team of suitably qualified and experienced<br />
experts whose appointment has been endorsed by the<br />
Director-General;<br />
(b) be prepared in consultation with relevant stakeholders,<br />
including WCC and the CCC;<br />
(c) investigate options for the future use of the area upon the<br />
completion of mining;<br />
(d) describe and justify the proposed rehabilitation strategy for<br />
the area; and<br />
(e) define the rehabilitation objectives for the area, as well as<br />
the proposed completion criteria for this rehabilitation.<br />
Progressive Rehabilitation<br />
6/3 To the extent that mining operations permit, the Proponent shall carry<br />
out rehabilitation progressively, that is, as soon as reasonably<br />
practicable following the disturbance.<br />
Rehabilitation Management Plan<br />
6/4 The Proponent shall prepare and implement a Rehabilitation<br />
Management Plan for the project to the satisfaction of the Executive<br />
Director Mineral Resources. This plan must be prepared in<br />
consultation with the relevant stakeholders, and submitted to DPI for<br />
approval prior to carrying out any second workings in the mining area.<br />
Note: In accordance with condition 12 of schedule 2, the preparation<br />
and implementation of Rehabilitation Management Plans is likely to be<br />
staged, with each plan covering a defined area (or domain) for<br />
rehabilitation. In addition, while mining operations are being carried<br />
out, some of the proposed remediation or rehabilitation measures may<br />
be included in the detailed management plans that form part of the<br />
Extraction Plan. If this is the case, however, then the Proponent will be<br />
required to ensure that there is good cross-referencing between the<br />
various management plans.<br />
2011<br />
Letter from DP&I Endorsing<br />
Experts for Rehabilitation<br />
Strategy Development, 8 Oct<br />
2011<br />
Rehabilitation Strategy, Oct<br />
2011<br />
Letter to DP&I re<br />
Rehabilitation Strategy, 26<br />
Oct 2011<br />
<strong>Metropolitan</strong> Colliery<br />
Rehabilitation Management<br />
Plan, Dec 2010<br />
Letter from DI&I re Approval<br />
of the Rehabilitation<br />
Management Plan, 22 Oct<br />
2010<br />
C<br />
C<br />
C<br />
C<br />
C<br />
Noted<br />
C<br />
the Director-General on 26 October 2011:<br />
(a) The team of suitably qualified experts to prepare<br />
the Rehabilitation Strategy was approved by<br />
DP&I on 8 October 2011:<br />
• Reece McDougall, Heritage Consultant, Godden<br />
Mackay Logan Pty Ltd.<br />
• Elizabeth Norris, Ecologist/Botanist, Eco Logical<br />
Australia.<br />
• Allan Watson, Civil Engineering Consultant,<br />
Allan Watson Associates Pty Ltd.<br />
(b) consultation with Wollongong City Council on<br />
(26 September 2011), Community Consultative<br />
Community (2 August 2011 and 16 August<br />
2011), and the Helensburgh and District<br />
Historical Society (2 August 2011 and 8 August<br />
2011).<br />
(c) Section 4 Future Land Use Options<br />
(d) Section 5 Rehabilitation Objectives<br />
(e) Section 5 and 6 Completion Criteria<br />
The Rehabilitation Management Plan was prepared<br />
and submitted to the Director-General prior to<br />
carrying out any second workings in the Long-wall<br />
20-22 mining area.<br />
<br />
<br />
<br />
<br />
DP&I approved the Rehabilitation Management<br />
Plan on 14 May 2010, subject to comments<br />
provided in a letter dated 21 April 2010 being<br />
addressed prior to 31 October 2011.<br />
Rehabilitation Management Plan approved by<br />
NSW I&I (Mineral Resources) on 22 October<br />
2010.<br />
Rev A of the Rehabilitation Management Plan<br />
was distributed to the SCA, DECCW, NSW<br />
Office of Water, NSW I&I (Fisheries), DoP and<br />
NSW I&I (Mineral Resources). Rev B of the<br />
RMP addressed comments from NSW I&I<br />
(Mineral Resources), SCA and DoP.<br />
xxvi<br />
| <strong>Metropolitan</strong> <strong>Coal</strong> <strong>Project</strong> Approval, Environment Protection License and Consolidated Mining Lease