<strong>Metropolitan</strong> <strong>Coal</strong> <strong>Independent</strong> Environmental Audit<br />

Condition<br />

No.<br />

Condition Verification Compliance Comments<br />

of the Director-General. This strategy must:<br />

(a) be prepared by a team of suitably qualified and experienced<br />

experts whose appointment has been endorsed by the<br />

Director-General;<br />

(b) be prepared in consultation with relevant stakeholders,<br />

including WCC and the CCC;<br />

(c) investigate options for the future use of the area upon the<br />

completion of mining;<br />

(d) describe and justify the proposed rehabilitation strategy for<br />

the area; and<br />

(e) define the rehabilitation objectives for the area, as well as<br />

the proposed completion criteria for this rehabilitation.<br />

Progressive Rehabilitation<br />

6/3 To the extent that mining operations permit, the Proponent shall carry<br />

out rehabilitation progressively, that is, as soon as reasonably<br />

practicable following the disturbance.<br />

Rehabilitation Management Plan<br />

6/4 The Proponent shall prepare and implement a Rehabilitation<br />

Management Plan for the project to the satisfaction of the Executive<br />

Director Mineral Resources. This plan must be prepared in<br />

consultation with the relevant stakeholders, and submitted to DPI for<br />

approval prior to carrying out any second workings in the mining area.<br />

Note: In accordance with condition 12 of schedule 2, the preparation<br />

and implementation of Rehabilitation Management Plans is likely to be<br />

staged, with each plan covering a defined area (or domain) for<br />

rehabilitation. In addition, while mining operations are being carried<br />

out, some of the proposed remediation or rehabilitation measures may<br />

be included in the detailed management plans that form part of the<br />

Extraction Plan. If this is the case, however, then the Proponent will be<br />

required to ensure that there is good cross-referencing between the<br />

various management plans.<br />

2011<br />

Letter from DP&I Endorsing<br />

Experts for Rehabilitation<br />

Strategy Development, 8 Oct<br />

2011<br />

Rehabilitation Strategy, Oct<br />

2011<br />

Letter to DP&I re<br />

Rehabilitation Strategy, 26<br />

Oct 2011<br />

<strong>Metropolitan</strong> Colliery<br />

Rehabilitation Management<br />

Plan, Dec 2010<br />

Letter from DI&I re Approval<br />

of the Rehabilitation<br />

Management Plan, 22 Oct<br />

2010<br />

C<br />

C<br />

C<br />

C<br />

C<br />

Noted<br />

C<br />

the Director-General on 26 October 2011:<br />

(a) The team of suitably qualified experts to prepare<br />

the Rehabilitation Strategy was approved by<br />

DP&I on 8 October 2011:<br />

• Reece McDougall, Heritage Consultant, Godden<br />

Mackay Logan Pty Ltd.<br />

• Elizabeth Norris, Ecologist/Botanist, Eco Logical<br />

Australia.<br />

• Allan Watson, Civil Engineering Consultant,<br />

Allan Watson Associates Pty Ltd.<br />

(b) consultation with Wollongong City Council on<br />

(26 September 2011), Community Consultative<br />

Community (2 August 2011 and 16 August<br />

2011), and the Helensburgh and District<br />

Historical Society (2 August 2011 and 8 August<br />

2011).<br />

(c) Section 4 Future Land Use Options<br />

(d) Section 5 Rehabilitation Objectives<br />

(e) Section 5 and 6 Completion Criteria<br />

The Rehabilitation Management Plan was prepared<br />

and submitted to the Director-General prior to<br />

carrying out any second workings in the Long-wall<br />

20-22 mining area.<br />

<br />

<br />

<br />

<br />

DP&I approved the Rehabilitation Management<br />

Plan on 14 May 2010, subject to comments<br />

provided in a letter dated 21 April 2010 being<br />

addressed prior to 31 October 2011.<br />

Rehabilitation Management Plan approved by<br />

NSW I&I (Mineral Resources) on 22 October<br />

2010.<br />

Rev A of the Rehabilitation Management Plan<br />

was distributed to the SCA, DECCW, NSW<br />

Office of Water, NSW I&I (Fisheries), DoP and<br />

NSW I&I (Mineral Resources). Rev B of the<br />

RMP addressed comments from NSW I&I<br />

(Mineral Resources), SCA and DoP.<br />

xxvi<br />

| <strong>Metropolitan</strong> <strong>Coal</strong> <strong>Project</strong> Approval, Environment Protection License and Consolidated Mining Lease