22.11.2014 Views

linked document - Copperfield College

linked document - Copperfield College

linked document - Copperfield College

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Key Improvement Strategies<br />

and Significant Projects<br />

What<br />

(Actions)<br />

the activities and programs<br />

required to progress the key<br />

improvement strategies<br />

How<br />

(Resources)<br />

the budget, equipment,<br />

IT, learning time,<br />

learning space<br />

Who<br />

the individuals or teams<br />

responsible for<br />

implementation<br />

When<br />

the date, week,<br />

month or term for<br />

completion<br />

Achievement milestones<br />

the changes in practice or<br />

behaviours<br />

Have both the “General<br />

Pedagogy” and “KLA”<br />

versions of the Classroom<br />

Climate Instrument<br />

operational<br />

Consultation with staff<br />

and KLA Leaders.<br />

Using ‘Survey Monkey’<br />

and Excel to format<br />

P&DC Team<br />

Trial during<br />

semester 1 2010<br />

All staff to use the instruments by the<br />

end of 2010<br />

Embed an understanding of<br />

the value of Classroom<br />

Observations as a<br />

professional learning tool<br />

amongst all staff<br />

Discussion and<br />

consultation time<br />

allocated during PLT’s<br />

and campus meetings<br />

P&DC Team and ILT<br />

Leaders<br />

Dec 2010<br />

Trial and evaluate a pilot<br />

team to undertake structured<br />

classroom observations<br />

Draft a proposal for<br />

PCO’s. Consult with<br />

staff. Allocate some<br />

periods for<br />

implementation<br />

P&DC Team, PCO’s<br />

Dec 2010<br />

A small group of staff undertook the<br />

observations and provided an evaluation<br />

to the P&DC Team<br />

Design a Leadership<br />

Development program that<br />

focuses on succession<br />

planning and induction into a<br />

new role<br />

Draft a proposal and<br />

present to ILT’s<br />

P&DC Team and ILT<br />

Leaders<br />

Dec 2010<br />

Develop a Professional<br />

Draft a proposal and<br />

present to staff<br />

P&DC Team, led by the<br />

PL Leader<br />

Apr 2010

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!