Monthly <strong>co</strong>st per kW.<br />
AxB) Amount<br />
Monthly fixed <strong>co</strong>st (installed power multiplied<br />
by monthly tariff), automatically calculated by<br />
<strong>WattSoft3</strong>.<br />
C) Over power demand limit<br />
Upper kWdmd limit admitted by the supplier.<br />
If kWdmd has exceeded the installed power<br />
(A) but was always lower then this limit (C),<br />
the fixed <strong>co</strong>st of the month be<strong>co</strong>mes equal to<br />
AxC. If Monthly reset is ON, the fixed amount<br />
is reset to the original value (AxB) at the<br />
beginning of every new month.<br />
D) Over power demand tariff<br />
Tariff per kW applied if the actual kWdmd has<br />
exceeded the over power demand limit (C). In<br />
this case, the fixed <strong>co</strong>st will be equal to A x C<br />
+ D x (kWdmdmax – C).<br />
If Monthly reset is ON, the fixed amount is<br />
reset to the original value (AxB) at the<br />
beginning of every new month.<br />
The variable <strong>co</strong>sts are calculated using the<br />
following parameters:<br />
E) Active energy tariff<br />
Active energy <strong>co</strong>st per kWh.<br />
F) Reactive energy limit 1<br />
First limit of the reactive energy expressed as<br />
percentage of the installed power (A). Under<br />
this limit no additional <strong>co</strong>sts are due for the<br />
reactive energy <strong>co</strong>nsumption.<br />
G) Reactive energy tariff 1<br />
Cost of the reactive energy per kvarh. This<br />
tariff is applied only if the reactive energy<br />
exceeds the kvar limit 1 (F) and is lower than<br />
kvar limit 2 (H).<br />