Summary of our Performance: SECTION 2<br />

Section 2:<br />

Affordable<br />

<strong>and</strong> efficient<br />

delivery<br />

Living within our<br />

means<br />

Following the Spending<br />

Review 2010, we were<br />

set the challenge of<br />

continuing to manage<br />

the delivery of our<br />

programme effectively,<br />

remaining focused on<br />

our priorities, whilst<br />

driving out costs to<br />

deliver within funding<br />

levels that reduce from<br />

£2.6 billion in 2010-11 to<br />

£2.0 billion in 2014-15<br />

(excluding depreciation<br />

<strong>and</strong> annually managed<br />

expenditure (AME)).<br />

Three key programme<br />

areas were identified<br />

where we committed to<br />

lower levels of funding<br />

<strong>and</strong> the Spending<br />

Review assumed these<br />

reductions.<br />

The three key programme<br />

areas were:<br />

• Major Schemes, where we<br />

agreed to start a defined<br />

programme of 14 schemes<br />

by 2014-15 within a funding<br />

envelope that delivered at least<br />

20 per cent efficiencies.<br />

• Traffic Management, where we<br />

committed to a broad range of<br />

operational improvements to our<br />

Traffic Officer Service <strong>and</strong> other<br />

Traffic Management functions<br />

whilst also cutting costs by 20<br />

per cent by the end of 2013-14.<br />

• Maintenance, where we expect<br />

to reduce annual spending<br />

from an average of over £900<br />

million to an average of about<br />

£700 million over the four year<br />

Spending Review 2010 period.<br />

Our performance in <strong>2011</strong>-12<br />

sets us on a good trajectory to<br />

achieve the required savings<br />

whilst delivering a high level of<br />

service. More detail on how we are<br />

progressing on delivering these<br />

efficiencies can be found in this<br />

report.<br />

The importance of investment<br />

in the strategic road network<br />

infrastructure was emphasised<br />

in the Chancellor’s Autumn <strong>2011</strong><br />

Statement which announced a<br />

significant tranche of investment<br />

to drive economic growth in<br />

this country. This included an<br />

increase in funding for transport<br />

infrastructure, which is in addition<br />

to that announced in the Spending<br />

Review.<br />

Our performance in<br />

<strong>2011</strong>-12<br />

Our total budget for <strong>2011</strong>-12 was<br />

£3,954 million <strong>and</strong> was divided into:<br />

• Departmental Expenditure Limit<br />

(DEL) budgets which are the<br />

firm budgets (resource <strong>and</strong><br />

capital) set in the Spending<br />

Review 2010.<br />

• <strong>Annual</strong> Managed Expenditure<br />

(AME) budgets which apply<br />

to items that are volatile <strong>and</strong><br />

which the <strong>Agency</strong> could not be<br />

expected to absorb within the<br />

firm DEL plans.<br />

A segmental analysis of our <strong>2011</strong>-<br />

12 expenditure is included at<br />

Note 2 to the accounts. The most<br />

significant segments are:<br />

Maintenance: The infrastructure<br />

of the strategic road network<br />

is one of the most valuable<br />

single public assets, <strong>and</strong><br />

maintenance of it consumed a<br />

high proportion of the <strong>Agency</strong>’s<br />

spend in <strong>2011</strong>-12 (over 33 per<br />

cent of the total DEL expenditure<br />

excluding depreciation). The work<br />

undertaken includes replacing<br />

<strong>and</strong> maintaining surfaces, bridges<br />

Spending Review 2010 Programme funding <strong>and</strong> Growth Review<br />

Departmental Expenditure Limit (DEL) budget excluding depreciation<br />

£m<br />

3,000<br />

2,500<br />

2,000<br />

1,500<br />

1,000<br />

Resource DEL<br />

Capital DEL SR10<br />

Capital DEL Growth Review<br />

500<br />

<strong>2011</strong>-12 <strong>2012</strong>-13 2013-14 2014-15<br />

Spending Review 2010 period<br />

<strong>Highways</strong> <strong>Agency</strong> <strong>Annual</strong> <strong>Report</strong> <strong>and</strong> <strong>Accounts</strong> <strong>2011</strong>-12