SECTION 2: Summary of our Performance<br />
Case Study:<br />
Spend Recovery<br />
Audit<br />
In May <strong>2011</strong>, the<br />
Department for<br />
Transport <strong>and</strong> its<br />
Agencies underwent<br />
an independent review<br />
of historic spending to<br />
ensure all recoverable<br />
amounts were identified.<br />
In the <strong>Agency</strong> the review<br />
sampled 383,000 invoices<br />
totalling some £17<br />
billion of expenditure<br />
since 2002. Only 17<br />
items were identified for<br />
recovery action, totalling<br />
£48,000. The results<br />
provide assurance as to<br />
the robust processes <strong>and</strong><br />
controls that we have in<br />
place in the <strong>Agency</strong>.<br />
Net Resource Expenditure<br />
(not including non-allocated income)<br />
Major Improvements<br />
Maintaining the Network<br />
Technology Improvements<br />
Traffic Management<br />
Smaller schemes <strong>and</strong> R&D<br />
Running Costs - Programme<br />
Running Costs - Admin<br />
<strong>and</strong> other structures (over 700<br />
renewal schemes delivered in<br />
the year). It also includes the<br />
associated upkeep of fencing,<br />
drainage, lighting <strong>and</strong> signage,<br />
<strong>and</strong> the cost of keeping the<br />
network open in winter.<br />
Public Finance Initiative (PFI):<br />
The <strong>Agency</strong> has 12 PFI contracts,<br />
11 of which are for the design,<br />
build, finance <strong>and</strong> operation<br />
of sections of the network<br />
including the M25 widening <strong>and</strong><br />
maintenance for 30 years. The<br />
expenditure is included in the<br />
Major Improvements segment<br />
<strong>and</strong> details of these contracts<br />
are included in Note 18 to the<br />
accounts. Approximately 40 per<br />
cent of the <strong>Agency</strong>’s resource<br />
DEL expenditure (excluding<br />
depreciation) relates to the service<br />
payments on these contracts.<br />
Major Capital Improvements:<br />
During <strong>2011</strong>-12, £831 million<br />
was invested in major projects<br />
on the strategic road network<br />
including the completion of<br />
major investments on the A3 at<br />
Hindhead, on the A1 between<br />
Dishforth <strong>and</strong> Leeming <strong>and</strong> on<br />
the A46 between Newark <strong>and</strong><br />
Widmerpool. New schemes were<br />
also started on the A23 between<br />
H<strong>and</strong>cross <strong>and</strong> Warninglid, on the<br />
M62 between J25-30 <strong>and</strong> on the<br />
M4/M5 interchange.<br />
Resource DEL (excluding<br />
depreciation)<br />
The positive variance of 4 per cent<br />
reflects:<br />
• higher income than budgeted.<br />
• early action taken to reduce<br />
activity <strong>and</strong> spend levels in a<br />
controlled way slightly ahead of<br />
the reducing funding levels over<br />
the Spending Review period.<br />
• a reduction in administration<br />
expenditure.<br />
• programme prioritisation,<br />
including activity being taken<br />
in-house.<br />
Resource DEL depreciation<br />
The final depreciation charge<br />
against the infrastructure asset<br />
was less than budgeted. As well<br />
as the level of expenditure on<br />
capital renewals, the depreciation<br />
charge is impacted by the<br />
condition of road surfaces <strong>and</strong><br />
indexation of the network<br />
valuation. Both of these factors<br />
are difficult to predict accurately<br />
Outturn against budget: The outturn against the budget is summarised as follows:<br />
Budgetary Performance <strong>2011</strong>-12<br />
Actual<br />
£m<br />
Budget<br />
£m<br />
Variance<br />
£m<br />
Resource DEL (excluding depreciation) 1,095 1,145 50<br />
Resource DEL depreciation 788 870 82<br />
Resource AME 492 651 159<br />
Total Net Operating Cost 2,375 2,666 291<br />
Capital DEL 1,315 1,288 (27)<br />
Capital AME (33) - 33<br />
Total Capital Budget 1,282 1,288 6<br />
Total Budget 3,657 3,954 297<br />
in advance <strong>and</strong> both have moved<br />
in a way that generates a positive<br />
variance.<br />
Resource AME<br />
The main item within this budget is<br />
the write-down of the infrastructure<br />
asset to reflect the difference<br />
between the actual cost of<br />
construction <strong>and</strong> the st<strong>and</strong>ard<br />
replacement cost.<br />
<strong>Highways</strong> <strong>Agency</strong> <strong>Annual</strong> <strong>Report</strong> <strong>and</strong> <strong>Accounts</strong> <strong>2011</strong>-12