SECTION 2: Summary of our Performance<br />

Case Study:<br />

Spend Recovery<br />

Audit<br />

In May <strong>2011</strong>, the<br />

Department for<br />

Transport <strong>and</strong> its<br />

Agencies underwent<br />

an independent review<br />

of historic spending to<br />

ensure all recoverable<br />

amounts were identified.<br />

In the <strong>Agency</strong> the review<br />

sampled 383,000 invoices<br />

totalling some £17<br />

billion of expenditure<br />

since 2002. Only 17<br />

items were identified for<br />

recovery action, totalling<br />

£48,000. The results<br />

provide assurance as to<br />

the robust processes <strong>and</strong><br />

controls that we have in<br />

place in the <strong>Agency</strong>.<br />

Net Resource Expenditure<br />

(not including non-allocated income)<br />

Major Improvements<br />

Maintaining the Network<br />

Technology Improvements<br />

Traffic Management<br />

Smaller schemes <strong>and</strong> R&D<br />

Running Costs - Programme<br />

Running Costs - Admin<br />

<strong>and</strong> other structures (over 700<br />

renewal schemes delivered in<br />

the year). It also includes the<br />

associated upkeep of fencing,<br />

drainage, lighting <strong>and</strong> signage,<br />

<strong>and</strong> the cost of keeping the<br />

network open in winter.<br />

Public Finance Initiative (PFI):<br />

The <strong>Agency</strong> has 12 PFI contracts,<br />

11 of which are for the design,<br />

build, finance <strong>and</strong> operation<br />

of sections of the network<br />

including the M25 widening <strong>and</strong><br />

maintenance for 30 years. The<br />

expenditure is included in the<br />

Major Improvements segment<br />

<strong>and</strong> details of these contracts<br />

are included in Note 18 to the<br />

accounts. Approximately 40 per<br />

cent of the <strong>Agency</strong>’s resource<br />

DEL expenditure (excluding<br />

depreciation) relates to the service<br />

payments on these contracts.<br />

Major Capital Improvements:<br />

During <strong>2011</strong>-12, £831 million<br />

was invested in major projects<br />

on the strategic road network<br />

including the completion of<br />

major investments on the A3 at<br />

Hindhead, on the A1 between<br />

Dishforth <strong>and</strong> Leeming <strong>and</strong> on<br />

the A46 between Newark <strong>and</strong><br />

Widmerpool. New schemes were<br />

also started on the A23 between<br />

H<strong>and</strong>cross <strong>and</strong> Warninglid, on the<br />

M62 between J25-30 <strong>and</strong> on the<br />

M4/M5 interchange.<br />

Resource DEL (excluding<br />

depreciation)<br />

The positive variance of 4 per cent<br />

reflects:<br />

• higher income than budgeted.<br />

• early action taken to reduce<br />

activity <strong>and</strong> spend levels in a<br />

controlled way slightly ahead of<br />

the reducing funding levels over<br />

the Spending Review period.<br />

• a reduction in administration<br />

expenditure.<br />

• programme prioritisation,<br />

including activity being taken<br />

in-house.<br />

Resource DEL depreciation<br />

The final depreciation charge<br />

against the infrastructure asset<br />

was less than budgeted. As well<br />

as the level of expenditure on<br />

capital renewals, the depreciation<br />

charge is impacted by the<br />

condition of road surfaces <strong>and</strong><br />

indexation of the network<br />

valuation. Both of these factors<br />

are difficult to predict accurately<br />

Outturn against budget: The outturn against the budget is summarised as follows:<br />

Budgetary Performance <strong>2011</strong>-12<br />

Actual<br />

£m<br />

Budget<br />

£m<br />

Variance<br />

£m<br />

Resource DEL (excluding depreciation) 1,095 1,145 50<br />

Resource DEL depreciation 788 870 82<br />

Resource AME 492 651 159<br />

Total Net Operating Cost 2,375 2,666 291<br />

Capital DEL 1,315 1,288 (27)<br />

Capital AME (33) - 33<br />

Total Capital Budget 1,282 1,288 6<br />

Total Budget 3,657 3,954 297<br />

in advance <strong>and</strong> both have moved<br />

in a way that generates a positive<br />

variance.<br />

Resource AME<br />

The main item within this budget is<br />

the write-down of the infrastructure<br />

asset to reflect the difference<br />

between the actual cost of<br />

construction <strong>and</strong> the st<strong>and</strong>ard<br />

replacement cost.<br />

<strong>Highways</strong> <strong>Agency</strong> <strong>Annual</strong> <strong>Report</strong> <strong>and</strong> <strong>Accounts</strong> <strong>2011</strong>-12