23.01.2015 Views

A Review of the Event Analysis of Systemic Teamwork Methodology

A Review of the Event Analysis of Systemic Teamwork Methodology

A Review of the Event Analysis of Systemic Teamwork Methodology

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

HFIDTC/WP1.1.3/10<br />

Version 2/ 31 October 2005<br />

Table 12 – CDM Phase 3: Perform isolation<br />

Goal Specification<br />

Cue identification<br />

Expectancy<br />

Conceptual Model<br />

Uncertainty<br />

Information<br />

Situation Awareness<br />

Situation<br />

Assessment<br />

Options<br />

Stress<br />

Choice<br />

Analogy<br />

Ensure it is safe to perform local isolation.<br />

Confirm circuits/equipment to be operated.<br />

Telecontrol displays/circuit loadings.<br />

Equipment labels.<br />

Equipment displays.<br />

O<strong>the</strong>r temporary notices.<br />

Equipment configured according to planned circuit switching.<br />

Equipment will function correctly.<br />

Layout/type/characteristics <strong>of</strong> circuit.<br />

Circuit loadings/balance.<br />

Function <strong>of</strong> equipment.<br />

Will equipment physically work as expected (will something jam etc.).<br />

O<strong>the</strong>r work being carried out by o<strong>the</strong>r parties (e.g. EDF).<br />

Switching log.<br />

Visual and verbal information from those undertaking <strong>the</strong> work.<br />

Physical information from apparatus and telecontrol displays.<br />

All information used<br />

Inform NOC that isolation cannot be performed/o<strong>the</strong>r aspects <strong>of</strong><br />

switching instructions cannot be carried out.<br />

Some time pressure.<br />

Possibly some difficulties in operating or physically handling <strong>the</strong><br />

equipment.<br />

Yes – proceduralised within equipment types. Occasional non-routine<br />

activities required to cope with unusual/unfamiliar equipment, or<br />

equipment not owned by NGT.<br />

Yes – <strong>of</strong>ten. Except in cases with unfamiliar equipment.<br />

18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!