HFIDTC/WP1.1.3/10<br />

Version 2/ 31 October 2005<br />

Options<br />

Stress<br />

Choice<br />

No alternatives<br />

N/A<br />

WE1000 – need to remove what does not apply<br />

Could add front and rear busbar procedures<br />

Analogy<br />

Best practice guide for metal clad EMS switching<br />

Table 30 - CDM Phase 2: Deal with switching requests<br />

Goal Specification<br />

Cue identification<br />

Expectancy<br />

Conceptual Model<br />

Uncertainty<br />

Information<br />

Situation<br />

Awareness<br />

Situation<br />

Assessment<br />

Options<br />

Stress<br />

Choice<br />

Analogy<br />

Obtain confirmation from NOC that planned isolation is still required.<br />

Approaching time for planned isolation.<br />

Switching phone rings throughout building.<br />

Airblast circuit breakers (accompanied by sirens) can be heard to operate remotely<br />

(more so in Barking 275 than Barking C 132).<br />

Yes – routine planned work according to fixed procedures.<br />

Wokingham have performed remote isolations already.<br />

Circuit configured ready for local isolation.<br />

Physical verification <strong>of</strong> apparatus always required (DBI – don’t believe it).<br />

Proceduralised information from NOC – circuit, location, time, actions required etc.<br />

Switching log.<br />

Switching log.<br />

Physical status <strong>of</strong> apparatus.<br />

Planning documentation.<br />

Visual or verbal information from substation personnel.<br />

Planning documentation used only occasionally<br />

Refusal <strong>of</strong> switching request.<br />

Additional conditions to switching request.<br />

Some time pressure.<br />

Yes – highly proceduralised anyway<br />

Yes – routine activity<br />

Table 31 – CDM Phase 3: Perform isolation<br />

80