HFIDTC/WP1.1.3/10<br />

Version 2/ 31 October 2005<br />

Related methods<br />

The EAST methodology is comprised <strong>of</strong> a number <strong>of</strong> HF methods, including HTA,<br />

observation, CDA, CUD, OSD’s, SNA, CDM and propositional networks. The authors<br />

have also developed <strong>the</strong> WESTT methodology, which can be used to automate a large<br />

portion <strong>of</strong> <strong>the</strong> EAST analysis procedure.<br />

Approximate training and application times<br />

The EAST methodology is conceptually simple, however due to <strong>the</strong> number <strong>of</strong><br />

component methods involved, requires a lengthy training session. Some prior experience<br />

in <strong>the</strong> application <strong>of</strong> HF methods is required. For <strong>the</strong> recent applications <strong>of</strong> EAST<br />

described in this report, a training session lasting approximately 8 hours was given to <strong>the</strong><br />

analysts involved. Due to <strong>the</strong> exhaustive nature <strong>of</strong> <strong>the</strong> EAST methodology, and <strong>the</strong><br />

complex nature <strong>of</strong> C4i activity, <strong>the</strong> typical application time is high. The construction <strong>of</strong><br />

<strong>the</strong> HTA and <strong>the</strong> OSD for C4i scenarios is a particularly lengthy process. Conducting an<br />

EAST analysis manually can take up to two weeks for large, complex scenarios. The<br />

application time is significantly reduced by <strong>the</strong> provision <strong>of</strong> <strong>the</strong> WESTT s<strong>of</strong>tware<br />

package, which automates a large portion <strong>of</strong> <strong>the</strong> EAST analysis process.<br />

Reliability and validity<br />

Intra and inter reliability may be questionable in some instances. For example, different<br />

analysts may make different interpretations <strong>of</strong> <strong>the</strong> OSD symbols in <strong>the</strong> OSD glossary.<br />

The use <strong>of</strong> multiple methods within <strong>the</strong> EAST framework heightens <strong>the</strong> potential for<br />

unreliability. It is difficult to assess <strong>the</strong> validity <strong>of</strong> <strong>the</strong> data obtained during an EAST<br />

analysis. Typically, SMEs are used during data collection, and so a high level <strong>of</strong> validity<br />

is assumed.<br />

Congruent validity is favourable due to effective methods integration. Construct validity<br />

also good, as component methods relate well to <strong>the</strong> core descriptive constructs <strong>of</strong> C4i<br />

(Walker et al 2005b). Construct and face validity are also good because many <strong>of</strong> <strong>the</strong><br />

features <strong>of</strong> interest are also observable and manifest in <strong>the</strong> environment <strong>of</strong> interest. The<br />

CDM complements this approach by tapping into <strong>the</strong> ‘implicit’ parts <strong>of</strong> <strong>the</strong> decision<br />

making process.<br />

Tools needed<br />

Due to <strong>the</strong> various component analyses involved in an EAST analysis, a number <strong>of</strong><br />

different tools and s<strong>of</strong>tware packages are required. For <strong>the</strong> observation and CDM phases<br />

<strong>of</strong> an EAST analysis, video and audio recording equipment is required. A word<br />

processing s<strong>of</strong>tware package such as Micros<strong>of</strong>t Word is required to transcribe <strong>the</strong><br />

observation and CDM data. The CDA is typically conducted using Micros<strong>of</strong>t Excel. A<br />

large part (e.g. OSD and SNA) <strong>of</strong> <strong>the</strong> EAST procedure can be automated by using <strong>the</strong><br />

WESTT s<strong>of</strong>tware package. Alternatively, <strong>the</strong> OSD CUD, and propositional networks are<br />

typically drawn using Micros<strong>of</strong>t Visio. The SNA is conducted using <strong>the</strong> Agna SNA<br />

s<strong>of</strong>tware package.<br />

24