<strong>Field</strong><br />
Devenick<br />
Area Northern North Sea<br />
Operator BP<br />
<strong>Development</strong> c<strong>on</strong>cept Subsea<br />
Transport c<strong>on</strong>cept 33.5km pipeline to East Brae<br />
Start-up Q2 2012<br />
Comments: BP has c<strong>on</strong>firmed plans to develop the Devenick HPHT gas/c<strong>on</strong>densate field as a<br />
subsea tieback to Marath<strong>on</strong>’s East Brae. In the envir<strong>on</strong>mental statement issued in Mar, it<br />
reveals that there will be two subsea wells located separately and tied back to a manifold by<br />
pipelines of 1.3 km. A further two producers may be drilled in a sec<strong>on</strong>d phase. Both the in-field<br />
lines and the export line will be pipe-in-pipe systems – 8in/14in for the former and 10in/16in or<br />
12in/20in for the latter. The export line may be laid by a reelship or a lay-barge. There will be<br />
<strong>on</strong>e new well, to be drilled by semisub Paul B Loyd Jr, and <strong>on</strong>e c<strong>on</strong>verted appraisal well <strong>on</strong><br />
which an interventi<strong>on</strong> operati<strong>on</strong> will be performed either by the same drilling rig or a light well<br />
interventi<strong>on</strong> vessel. Drilling/well work is due to start in mid year and offshore c<strong>on</strong>structi<strong>on</strong> and<br />
pipelay is scheduled for 2011. Devenick is scheduled to move through sancti<strong>on</strong> into executi<strong>on</strong><br />
in July. A joint feasibility study of the tieback with Marath<strong>on</strong> was completed in Dec when BP<br />
c<strong>on</strong>firmed that FEED was being performed by Petrofac. Subsea engineering services have<br />
been c<strong>on</strong>tracted to JP Kenny, subsea trees to Camer<strong>on</strong>, subsea c<strong>on</strong>trols to GE/Vetco and<br />
subsea ball and gate valves to BEL. Tendering is also under way for subsea c<strong>on</strong>structi<strong>on</strong> and<br />
umbilicals. Also involved in the East Brae study was Fairfield, which may tie Crawford back to<br />
the platform. Devenick may be <strong>on</strong>e of the eight HP/HT fields which stand to benefit from tax<br />
c<strong>on</strong>cessi<strong>on</strong>s offered in the pre-budget report in Dec.<br />
<strong>Field</strong><br />
Ensign<br />
Area Southern North Sea<br />
Operator Centrica<br />
<strong>Development</strong> c<strong>on</strong>cept Platform<br />
Transport c<strong>on</strong>cept 15km pipeline to Audrey B<br />
Start-up Q4 2011<br />
Comments: Centrica is looking for project sancti<strong>on</strong> for Ensign, a former Venture asset, in July<br />
and start-up by end 2011as export capacity becomes available in C<strong>on</strong>ocoPhillips’ Loggs<br />
system. Gas will be transported to Loggs via the Audrey B platform. Ensign will be developed<br />
with an unmanned wellhead platform – this may still be built by SLP under a frame agreement<br />
signed with Venture, if the yard, which went into receivership in Dec, finds a new owner in time.<br />
FEED is being performed by Genesis and Heerema. L<strong>on</strong>g-lead items were secured some time<br />
ago. There will be two or three producti<strong>on</strong> wells which will be hydraulically fractured. Subsea 7<br />
will perform pipelay, also under a frame agreement awarded by Venture. Reserves are<br />
estimated at 97 bcf. In 2009 Venture discovered gas in the nearby Andrea prospect, but it is<br />
unclear whether the find is commercial. If it is, it could be developed as a subsea tieback to<br />
Ensign.<br />