<strong>Field</strong> Vulcan East<br />

Area Southern North Sea<br />

Operator Silverst<strong>on</strong>e<br />

<strong>Development</strong> c<strong>on</strong>cept Subsea<br />

Transport c<strong>on</strong>cept Pipeline to Viking B?<br />

Start-up Q4 2011<br />

Comments: Silverst<strong>on</strong>e’s project to develop the Vulcan East gas field will be launched this<br />

spring, with start-up scheduled for late 2011. <strong>Development</strong> calls for a single horiz<strong>on</strong>tal subsea<br />

well which will be hydraulically fractured. It will be tied back to nearby infrastructure in the V-<br />

<strong>Field</strong>s area, possibly the Viking B complex. In-place gas reserves are estimated at 160 bcf. At<br />

a later stage development will also be c<strong>on</strong>sidered for the Vanquish discovery in the same<br />

regi<strong>on</strong>.<br />

<strong>Field</strong> Western Isles (ex Rinnes/Melville)<br />

Area Northern North Sea<br />

Operator Dana<br />

<strong>Development</strong> c<strong>on</strong>cept Floater<br />

Transport c<strong>on</strong>cept Offshore oil loading<br />

Start-up Q4 2012<br />

Comments: Following its discovery of Melville, Dana’s explorati<strong>on</strong> campaign <strong>on</strong> the Rinnes<br />

prospects led to significant finds at Rinnes East, Rinnes West and Rinnes South-East. These<br />

fields have been renamed Lewis, Harris, Uist and Barra and will be developed in a joint project<br />

known as the Western Isles development. The target start-up date is late 2012. Subsurface<br />

studies and c<strong>on</strong>ceptual engineering have been accelerated; both Genesis and Xodus are<br />

involved in this work. Producti<strong>on</strong> will take place through a floating producti<strong>on</strong> facility. There will<br />

be 12 subsea wells – six producers and six water injectors. The producers will be gas-lifted.<br />

Project sancti<strong>on</strong> is now scheduled for late 2010. According to Dana, reserves are 65m boe.<br />

<strong>Field</strong> West Wick<br />

Area Central North Sea<br />

Operator Centrica<br />

<strong>Development</strong> c<strong>on</strong>cept Extended-reach drilling<br />

Transport c<strong>on</strong>cept --<br />

Start-up 2011/12<br />

Comments: Centrica is in discussi<strong>on</strong>s with Chevr<strong>on</strong> about developing the West Wick oil<br />

discovery in the Outer Moray Firth – part of the Venture portfolio which it acquired last year –<br />

by drilling an extended-reach well from the Captain wellhead platform. The feasibility of such a<br />

well has been established. If agreement can be reached, the well could presumably get under<br />

way this year.<br />