<strong>Field</strong> *Jackdaw<br />

Area Central North Sea<br />

Operator BG<br />

<strong>Development</strong> c<strong>on</strong>cept Platform<br />

Transport c<strong>on</strong>cept Pipeline to Judy?<br />

Start-up 2015<br />

Comments: Start-up of the HP/HT Jackdaw field is provisi<strong>on</strong>ally set for 2015, according to BG.<br />

The next step will be an appraisal well spudding in Q3. Following the 14-m<strong>on</strong>th 30/2a-7<br />

appraisal and two sidetracks in 2007-08, partner OMV said the well c<strong>on</strong>firmed the significant<br />

potential of the field. BG, which following discovery said that Jackdaw could be <strong>on</strong>e of the<br />

largest finds of recent years, did not comment. A platform tied back to Judy could be the<br />

development soluti<strong>on</strong> – this is also C<strong>on</strong>ocoPhillips’ plan for developing the HP/HT Jasmine<br />

field in the same area, with start-up scheduled for late 2012. Jackdaw may be <strong>on</strong>e of the eight<br />

HP/HT fields which stand to benefit from tax c<strong>on</strong>cessi<strong>on</strong>s offered in the pre-budget report in<br />

Dec.<br />

<strong>Field</strong> Jasmine<br />

Area Central North Sea<br />

Operator C<strong>on</strong>ocoPhillips<br />

<strong>Development</strong> c<strong>on</strong>cept 3 platforms<br />

Transport c<strong>on</strong>cept 8.5km pipeline to Judy<br />

Start-up Q4 2012<br />

Comments: C<strong>on</strong>ocoPhillips aims to bring Jasmine <strong>on</strong> stream by late 2012, according to the<br />

envir<strong>on</strong>mental statement. Plans call for a 24-slot wellhead platform bridge-linked to a 38-bed<br />

accommodati<strong>on</strong> platform and delivering producti<strong>on</strong> via a 16in/20in multiphase pipe-in-pipe<br />

system to Judy for processing – here it will access the existing platform over a new riser<br />

platform. The pipeline may be integrated into a bundle with a carrier pipe of some 33 inches, in<br />

which case it will be divided into two 4.1km secti<strong>on</strong>s. The riser platform will also provide<br />

separati<strong>on</strong> facilities for Jasmine and a 12-slot wellbay for additi<strong>on</strong>al Judy wells. Power will be<br />

provided to the two Jasmine platforms by subsea cable from Judy. A flotel will be required at<br />

Judy to house the modificati<strong>on</strong> crew. Last year FEED optimisati<strong>on</strong> was performed by<br />

WorleyPars<strong>on</strong>s, which has now been c<strong>on</strong>tracted for FEED definiti<strong>on</strong> and advanced<br />

procurement services, with an opti<strong>on</strong> for detailed engineering. Bids have been delivered for the<br />

wellhead platform jacket, which will weigh some 5-6,000t; the topsides have also been<br />

tendered. The jacket of this platform will be installed in 2011 after which drilling by a heavyduty<br />

jackup will begin. The topsides, al<strong>on</strong>g with the other two platforms, which are opti<strong>on</strong>s <strong>on</strong><br />

the wellhead platform tender, will be installed in 2012. Jasmine was discovered in 2006; a<br />

further drilling campaign in 2007-08 found a sec<strong>on</strong>d structure known as North Terrace and<br />

appraised both fields. The hydrocarb<strong>on</strong>s are gas and c<strong>on</strong>densate in HPHT reservoirs. Jasmine<br />

may be <strong>on</strong>e of the eight HP/HT fields which stand to benefit from tax c<strong>on</strong>cessi<strong>on</strong>s offered in<br />

Dec’s pre-budget report. C<strong>on</strong>ocoPhillips has described Jasmine as <strong>on</strong>e of the largest recent<br />

finds <strong>on</strong> the <strong>UKCS</strong>, but gives no indicati<strong>on</strong> of reserves in the ES.<br />