<strong>Field</strong> Welland<br />

Area Southern North Sea<br />

Operator Perenco<br />

<strong>Field</strong> facilities 1,000t topsides, 570t jacket, two platform wells, three subsea<br />

wells, in-field flowlines and umbilicals, 18km export pipeline<br />

Producti<strong>on</strong> end 2002<br />

Comments: Although producti<strong>on</strong> from Welland ceased in 2002, decommissi<strong>on</strong>ing did not take<br />

place under the then operator Exx<strong>on</strong>Mobil as some reuse possibilities existed. In 2007 the<br />

platform passed to Perenco’s ownership. Reuse is no l<strong>on</strong>ger viable as the export pipeline has<br />

been disc<strong>on</strong>nected at Thames. Perenco, which has extensive southern basin assets, is<br />

preparing an overall decommissi<strong>on</strong>ing strategy before deciding what to do with Welland. The<br />

aband<strong>on</strong>ment of the two platform wells, <strong>on</strong>e of which was drilled into the Tristan field, may take<br />

place this year. The platform and subsea equipment will have to be removed but the pipelines<br />

and umbilicals could be left in place.<br />