<strong>Field</strong> **Wingate<br />

Area Southern North Sea<br />

Operator Wintershall<br />

<strong>Development</strong> c<strong>on</strong>cept Platform<br />

Transport c<strong>on</strong>cept 20km pipeline to D15-FA-1 (NL)<br />

Start-up October 2011<br />

Comments: Wintershall is seeking approval to develop the Wingate discovery in part-block<br />

44/24b with an unmanned platform with six well-slots. The field, which c<strong>on</strong>tains reserves of 116<br />

bcf, will be brought <strong>on</strong> stream through the discovery well recompleted as a producer. Then <strong>on</strong>e<br />

well will be drilled a year until all slots are utilised. Producti<strong>on</strong> will be exported across the<br />

median line to GDF Suez’ D15-FA-1 platform in the Dutch sector by a 12in flowline with a 2in<br />

methanol line piggybacked <strong>on</strong> it.<br />

<strong>Field</strong> York<br />

Area Southern North Sea<br />

Operator Centrica<br />

<strong>Development</strong> c<strong>on</strong>cept Platform<br />

Transport c<strong>on</strong>cept 0.5km pipeline to Cleet<strong>on</strong> trunkline<br />

Start-up Q4 2011/Q1 2012<br />

Comments: Having acquired the major stake and operatorship in the York gas field, Centrica<br />

plans to bring it <strong>on</strong> stream in late 2011/early 2012. Gas will be exported through a short link<br />

into the Cleet<strong>on</strong> trunkline. A hot-tap will be required to tie in the spur line, which will c<strong>on</strong>sist of<br />

six lengths of spoolpiece. The field, which c<strong>on</strong>sists of a southern and an eastern reservoir, will<br />

be developed with a small platform for which bids have been submitted. Two wells will be<br />

drilled, starting in July 2011. The platform and pipeline will be installed in spring/summer 2011.<br />

C<strong>on</strong>ceptual studies have been performed by Genesis. Reserves are 115 bcf.<br />