Update on UKCS Field Development Projects - Intsok
Update on UKCS Field Development Projects - Intsok
Update on UKCS Field Development Projects - Intsok
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Field</strong> *Maule<br />
Area Central North Sea<br />
Operator Apache<br />
<strong>Development</strong> c<strong>on</strong>cept Extended-reach drilling<br />
Transport c<strong>on</strong>cept --<br />
Start-up Mid 2010<br />
Comments: Approved Mar 2010. Apache is develop Maule, which has reserves of 2.9m boe,<br />
with an extended-reach well drilled from Forties A platform. Drilling by c<strong>on</strong>tractor Seawell is<br />
under way, Apache said in Apr. The field could therefore be <strong>on</strong> stream by mid year. The well<br />
will be fitted with dual electric submersible pumps supplied by Schlumberger. Depending <strong>on</strong><br />
results, a further two wells may be drilled. The company is also seeking approval to develop<br />
the nearby Bacchus field as a subsea tieback to Forties A.<br />
www.intsok.com<br />
| 3