13.11.2012 Views

Update on UKCS Field Development Projects - Intsok

Update on UKCS Field Development Projects - Intsok

Update on UKCS Field Development Projects - Intsok

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Field</strong><br />

Auk Redevelopment<br />

Area Central North Sea<br />

Operator Talisman<br />

<strong>Development</strong> c<strong>on</strong>cept Platform upgrade<br />

Transport c<strong>on</strong>cept --<br />

Start-up 2012<br />

Comments: Talisman is seeking approval to redevelop the main Auk field, installing a new<br />

drilling rig, living quarters and power generati<strong>on</strong> facilities and drilling up to nine new wells.<br />

Living quarters fabricati<strong>on</strong> is understood to have been awarded to C<strong>on</strong>safe. Start-up is<br />

scheduled for 2012. In parallel the company is implementing the development of the Auk North<br />

reserves as a subsea tieback to the Fulmar platform. This project is due to come <strong>on</strong> stream in<br />

2011.<br />

<strong>Field</strong> Bacchus<br />

Area Central North Sea<br />

Operator Apache<br />

<strong>Development</strong> c<strong>on</strong>cept Subsea<br />

Transport c<strong>on</strong>cept 6.5 km pipeline to Forties A<br />

Start-up Q2 2011<br />

Comments: Apache is applying for approval to develop Bacchus (35m bbl) as a subsea<br />

tieback to the Forties A platform with start-up in spring 2011. There will be three wells which<br />

will be drilled by jackup Rowan Gorilla VII starting in early 2011. These will be c<strong>on</strong>nected to a<br />

four-slot manifold integrated in the towhead of a pipeline bundle to be supplied by Subsea 7.<br />

The 37.5in bundle will c<strong>on</strong>tain two 6in producti<strong>on</strong> lines, a 6in water line and a 4in heating line<br />

plus return line, to be used when producti<strong>on</strong> has to be shut down and then restarted. The<br />

project will use GE subsea trees which Apache already has in stock. In parallel Apache is<br />

developing Maule with an extended-reach well from Forties A – this project has just been<br />

approved.<br />

www.intsok.com<br />

| 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!