Update on UKCS Field Development Projects - Intsok
Update on UKCS Field Development Projects - Intsok
Update on UKCS Field Development Projects - Intsok
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Field</strong><br />
Auk Redevelopment<br />
Area Central North Sea<br />
Operator Talisman<br />
<strong>Development</strong> c<strong>on</strong>cept Platform upgrade<br />
Transport c<strong>on</strong>cept --<br />
Start-up 2012<br />
Comments: Talisman is seeking approval to redevelop the main Auk field, installing a new<br />
drilling rig, living quarters and power generati<strong>on</strong> facilities and drilling up to nine new wells.<br />
Living quarters fabricati<strong>on</strong> is understood to have been awarded to C<strong>on</strong>safe. Start-up is<br />
scheduled for 2012. In parallel the company is implementing the development of the Auk North<br />
reserves as a subsea tieback to the Fulmar platform. This project is due to come <strong>on</strong> stream in<br />
2011.<br />
<strong>Field</strong> Bacchus<br />
Area Central North Sea<br />
Operator Apache<br />
<strong>Development</strong> c<strong>on</strong>cept Subsea<br />
Transport c<strong>on</strong>cept 6.5 km pipeline to Forties A<br />
Start-up Q2 2011<br />
Comments: Apache is applying for approval to develop Bacchus (35m bbl) as a subsea<br />
tieback to the Forties A platform with start-up in spring 2011. There will be three wells which<br />
will be drilled by jackup Rowan Gorilla VII starting in early 2011. These will be c<strong>on</strong>nected to a<br />
four-slot manifold integrated in the towhead of a pipeline bundle to be supplied by Subsea 7.<br />
The 37.5in bundle will c<strong>on</strong>tain two 6in producti<strong>on</strong> lines, a 6in water line and a 4in heating line<br />
plus return line, to be used when producti<strong>on</strong> has to be shut down and then restarted. The<br />
project will use GE subsea trees which Apache already has in stock. In parallel Apache is<br />
developing Maule with an extended-reach well from Forties A – this project has just been<br />
approved.<br />
www.intsok.com<br />
| 5