<strong>Field</strong><br />

Shelley South<br />

Area Central North Sea<br />

Operator Premier<br />

<strong>Field</strong> facilities FPSO Sevan Voyageur, two subsea wells, a 38t mini-manifold<br />

with 122t protecti<strong>on</strong> structure, a 2km, 8in producti<strong>on</strong> pipeline,<br />

c<strong>on</strong>trol umbilical and flexible riser..<br />

Producti<strong>on</strong> end Q3 2010<br />

Comments: Although the field <strong>on</strong>ly came <strong>on</strong> stream last Aug, producti<strong>on</strong> has been<br />

disappointing and Premier expects it so<strong>on</strong> to become sub-ec<strong>on</strong>omic – producti<strong>on</strong> will cease in<br />

Q3, according to Sevan. When this happens, Sevan, as owner of the FPSO and its mooring<br />

system, will be resp<strong>on</strong>sible for removing the platform from the field. Premier proposes<br />

retrieving all the subsea equipment but leaving the pipeline, which is trenched and rockdumped,<br />

in place. It recommends retrieving the umbilical in several secti<strong>on</strong>s. Offshore<br />

operati<strong>on</strong>s are expected to take place this year and in summer 2011.<br />

<strong>Field</strong><br />

Tristan North-West<br />

Area Southern North Sea<br />

Operator Silverst<strong>on</strong>e<br />

<strong>Field</strong> facilities One subsea producti<strong>on</strong> well, 15km, 6in producti<strong>on</strong> pipeline with<br />

umbilical piggybacked <strong>on</strong> it, to Davy platform.<br />

Producti<strong>on</strong> end 2010<br />

Comments: Silverst<strong>on</strong>e has decided to end producti<strong>on</strong> at Tristan North-West. In the draft<br />

decommissi<strong>on</strong>ing programme submitted in Feb, it proposes retrieving the tree, wellhead,<br />

spoolpieces, jumpers and secti<strong>on</strong>s of the pipeline and umbilical lying above the seabed, while<br />

leaving in place the buried pipeline and umbilical, which is the case for most of their length.<br />

Offshore operati<strong>on</strong>s are scheduled for Aug and Sept. A turnkey decommissi<strong>on</strong>ing c<strong>on</strong>tract has<br />

been awarded to CSL. Helix Well Ops has been subc<strong>on</strong>tracted for well interventi<strong>on</strong>,<br />

aband<strong>on</strong>ment engineering and diving services, using its well interventi<strong>on</strong> vessel Seawell, while<br />

BMT Cordah is resp<strong>on</strong>sible for envir<strong>on</strong>mental management services. In additi<strong>on</strong> to the<br />

producti<strong>on</strong> well, there is a suspended well to be aband<strong>on</strong>ed, which is the 1987 discovery well.<br />

Tristan NW was expected to c<strong>on</strong>tinue producing until 2013, but has performed disappointingly<br />

since it came <strong>on</strong> stream in April 2008.<br />