Update on UKCS Field Development Projects - Intsok
Update on UKCS Field Development Projects - Intsok
Update on UKCS Field Development Projects - Intsok
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
2 <strong>Projects</strong> <strong>on</strong> the move or likely to move<br />
2 new entries (marked **), 3 entries promoted from Secti<strong>on</strong> 3 (marked *).<br />
<strong>Field</strong> Andrew Area<br />
Area Central North Sea<br />
Operator BP<br />
<strong>Development</strong> c<strong>on</strong>cept Subsea<br />
Transport c<strong>on</strong>cept 28km pipeline to Andrew<br />
Start-up Q1 2012<br />
Comments: BP has issued the envir<strong>on</strong>mental statement for the Andrew Area development,<br />
involving the subsea tieback of Kinnoull and further development of Andrew’s Lower<br />
Cretaceous reservoir. Start-up <strong>on</strong> Kinnoull is scheduled for early 2012. There will be three<br />
horiz<strong>on</strong>tal wells tied into a 150t, four-slot manifold. The wells will be drilled by semisub Byford<br />
Dolphin starting in Q4. The manifold will be tied back to Andrew by a 28km, 14in producti<strong>on</strong><br />
pipeline in corrosi<strong>on</strong> resistant alloy, plus a 6in lift-gas line and a 3in methanol line. The<br />
pipelines may be bundled, in which case there will be four bundle secti<strong>on</strong>s. They will be routed<br />
via the Arundel field where a two-slot manifold will be installed for future use. The lines will tie<br />
into a 100t, gravity-base pipeline end manifold at the platform. A 44in caiss<strong>on</strong> riser will be<br />
installed <strong>on</strong> the jacket and a 750t recepti<strong>on</strong> module will be cantilevered <strong>on</strong> the topsides. The<br />
following c<strong>on</strong>tracts have been placed: topside engineering services for modificati<strong>on</strong>s <strong>on</strong><br />
Andrew to Wood Group; subsea engineering services to JP Kenny; subsea trees to Camer<strong>on</strong>;<br />
subsea c<strong>on</strong>trols to GE/Vetco; and subsea ball and gate valves to BEL. Tendering is also under<br />
way for subsea c<strong>on</strong>structi<strong>on</strong>, umbilicals, heavy-lift services, flotel support and module/caiss<strong>on</strong><br />
fabricati<strong>on</strong>. C<strong>on</strong>ceptual engineering has been performed by Xodus.<br />
<strong>Field</strong><br />
Athena<br />
Area Central North Sea<br />
Operator Ithaca<br />
<strong>Development</strong> c<strong>on</strong>cept FPSO<br />
Transport c<strong>on</strong>cept 2km in-field pipeline bundle<br />
Start-up Mid 2011<br />
Comments: The relaunched Athena project will have the BW Carmen FPSO as its producti<strong>on</strong><br />
facility; Ithaca issued a letter of intent to BW Offshore for it in Mar. The vessel will be<br />
lengthened to include a submerged turret loading (STL) system. According to a new<br />
envir<strong>on</strong>mental statement, there will be a single drilling centre c<strong>on</strong>nected to the FPSO by a<br />
2km, 29in pipeline bundle c<strong>on</strong>taining an 8in producti<strong>on</strong> pipeline, 8in injecti<strong>on</strong> water line and 3in<br />
service line. There will be four subsea producti<strong>on</strong> wells, of which three of which will be<br />
recompleted appraisal wells, plus <strong>on</strong>e water injector. They will be tied into a manifold<br />
integrated into the bundle towhead. Drilling is due to start in Q4. Engineering support is being<br />
provided by Petrex. Orders have been placed for l<strong>on</strong>g-lead items including subsea trees, which<br />
are expected to be supplied by GE, and downhole electric submersible pumps (ESPs). Ithaca<br />
intends to lease the subsea facilities. Reserves are 15.7m bbl, but the company is c<strong>on</strong>sidering<br />
adding two producers and a sec<strong>on</strong>d water injector, which would double recovery.<br />
www.intsok.com<br />
| 4